Home Projects More like: Development of High Grade Heat Storage for integration with Liquid Air Energy Storage [Clear] # Title Funder Funding Start End Status 81 Flexibility from Cooling and Storage (Flex-Cool-Store) EPSRC £2,227,836 Sept. 27, 2021 Sept. 26, 2024 Active 82 Flexibility from Cooling and Storage (Flex-Cool-Store) EPSRC £5,569,590 Sept. 27, 2021 Sept. 27, 2024 Active 83 ThermHydes: Thermochemical energy storage-assisted solid hydrogen storage EPSRC £1,343,368 Jan. 1, 2024 Dec. 31, 2025 Active 84 Hy-MAP 2.0 - Hydrogen mapping in hydrogen storage materials Innovate UK £73,380 March 31, 2023 Sept. 30, 2023 Closed 85 Optimised Solar Thermal Storage System for Delivering Process Heat at Temperatures Above 160 C EPSRC £0 Jan. 1, 2020 Sept. 29, 2022 Closed 86 Optimised Solar Thermal Storage System for Delivering Process Heat at Temperatures Above 160 C EPSRC £0 Jan. 1, 2020 Nov. 30, 2020 Closed 87 Utilising hydrogen to mitigate intermittency in renewable generation EPSRC £0 April 23, 2017 Oct. 22, 2020 Closed 88 Utilising hydrogen to mitigate intermittency in renewable generation EPSRC £0 April 23, 2017 Oct. 23, 2020 Closed 89 The generation of domestic hot water from SIM (Salt in Matrix) technologies EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 90 The generation of domestic hot water from SIM (Salt in Matrix) technologies EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 91 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £1,045,512 Aug. 31, 2020 Aug. 30, 2023 Active 92 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £2,613,780 Aug. 31, 2020 Feb. 29, 2024 Active 93 Cryogenic-temperature Cold Storage using Micro-encapsulated Phase Change Materials in Slurries EPSRC £1,868,550 Oct. 18, 2015 Sept. 29, 2020 Closed 94 Cryogenic-temperature Cold Storage using Micro-encapsulated Phase Change Materials in Slurries EPSRC £4,671,375 Oct. 18, 2015 Sept. 30, 2020 Closed 95 Industrial Demand Reduction through Innovative Storage Technologies (IDRIST) EPSRC £3,056,685 Dec. 1, 2014 May 31, 2017 Closed 96 COOL-E Innovate UK £1,745,450 Sept. 30, 2013 Dec. 31, 2015 Closed 97 Gravity based energy storage feasibility study Innovate UK £41,536 Jan. 1, 2022 March 30, 2022 Closed 98 Gravity based energy storage feasibility study Innovate UK £103,840 Jan. 1, 2022 March 31, 2022 Closed 99 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £2,594,834 Sept. 30, 2020 Sept. 29, 2024 Active 100 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £6,487,085 Sept. 30, 2020 Sept. 30, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »