Home Projects More like: Electrical treeing and tracking in polymeric interfaces in cable joints in DC networks [Clear] # Title Funder Funding Start End Status 21 Sustainable Power Cable Materials Technologies with Improved Whole Life Performance EPSRC £960,780 Sept. 30, 2008 Dec. 31, 2010 Closed 22 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC £207,854 Sept. 30, 2008 March 30, 2012 Closed 23 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC £658,024 Aug. 31, 2008 March 30, 2012 Closed 24 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC £106,132 Sept. 7, 2008 Sept. 6, 2011 Closed 25 Establishing an organic field scale forest nursery under Soil Association organic standards ISCF £229,970 June 30, 2022 Sept. 30, 2023 Closed 26 Hafren - High Voltage Lateral Bulk CMOS FETs Innovate UK £648,582 April 30, 2014 April 29, 2016 Closed 27 Distributed electrical current sensing for DC power networks Innovate UK £19,996 March 31, 2019 July 30, 2019 Closed 28 Distributed electrical current sensing for DC power networks Innovate UK £49,990 March 31, 2019 July 31, 2019 Closed 29 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £1,069,724 Oct. 30, 2014 Oct. 28, 2017 Closed 30 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £2,674,310 Oct. 30, 2014 Oct. 29, 2017 Closed 31 Co-delivery of food and climate regulation by temperate agroforestry (CALIBRE). NERC £1,210,055 Sept. 30, 2017 Dec. 31, 2019 Closed 32 Multilevel Inverter Topologies for MVDC EPSRC £0 Dec. 1, 2017 May 30, 2021 Closed 33 Multilevel Inverter Topologies for MVDC EPSRC £0 Dec. 1, 2017 May 31, 2021 Closed 34 Distributed multiport converters for integration of renewables, storage systems and loads while enhancing performance and resiliency of modern distributed networks (iPLUG) Horizon Europe Guarantee £1,614,590 Aug. 31, 2022 Aug. 31, 2025 Active 35 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £1,469,570 May 30, 2013 Dec. 16, 2016 Closed 36 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £3,673,925 May 30, 2013 Dec. 16, 2016 Closed 37 Delayed Biodegradability Innovate UK £349,744 April 30, 2022 Oct. 31, 2023 Active 38 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 39 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 40 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 Dec. 31, 2024 Active Reset Search Term(s): Status: --------- Active Closed Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »