# Title Funder Funding Start End Status
61 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£1,086,628
Jan. 1, 2020 Dec. 31, 2023 Active
62 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£2,716,570
Jan. 1, 2020 Sept. 30, 2024 Active
63 Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels EPSRC
£3,325,150
Dec. 1, 2016 Nov. 30, 2020 Closed
64 Innovative LWR Simulation Tool for the Nuclear Renaissance in the UK EPSRC
£1,220,675
June 30, 2018 June 30, 2021 Closed
65 Novel restoration materials for clean-up of radionuclides in the environment EPSRC
£1,285,970
Nov. 1, 2014 March 31, 2017 Closed
66 Feasibility of the use of frozen walls in molten salt fast reactors (MSFR-FW) EPSRC
£403,472
July 2, 2017 July 1, 2018 Closed
67 Radiation Damage in Nanoporous Nuclear Materials EPSRC
£1,952,755
Sept. 30, 2015 March 31, 2020 Closed
68 High performance deterministic radiation transport methods for SMRs EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
69 Digital fast neutron assay of uranium EPSRC
£84,505
Dec. 1, 2016 May 31, 2017 Closed
70 DAWNMANTLE - Decontamination and waste minimisation strategies for and using advanced molten salt nuclear technologies EPSRC
£1,905,200
Aug. 31, 2019 Feb. 28, 2023 Closed
71 Energy and the Physical Sciences:Beta-enhanced thermionic energy converters and nuclear batteries employing nanostructured diamond electrodes EPSRC
£4,759,730
March 31, 2013 Sept. 30, 2016 Closed
72 High Performance, Deterministic, Radiation Transport Methods for Radiation Shielding Analyses of Small Modular Reactors EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
73 enabling Sixty Years creep-fatigue life of the NExt generation nuclear Reactors 'SYNERgy' EPSRC
£6,236,305
March 1, 2019 Feb. 28, 2025 Active
74 UTGARD LAB PHASE II: A SIMFUEL FABRICATION & CHARACTERISATION FACILITY EPSRC
£1,504,110
Nov. 1, 2019 May 30, 2023 Active
75 UTGARD LAB PHASE II: A SIMFUEL FABRICATION & CHARACTERISATION FACILITY EPSRC
£3,760,275
Nov. 1, 2019 June 30, 2023 Closed
76 Development of the Segmented Inverted Coaxial Germanium (SIGMA) Detector for Enhanced Gamma-Ray Spectroscopy and Imaging STFC
£1,862,200
June 30, 2015 June 30, 2018 Closed
77 Predicting long-term performance of cement disposal systems for radionuclide-loaded zeolite and titanate ion exchangers EPSRC
£1,530,400
Nov. 1, 2016 March 31, 2019 Closed
78 Development of a High Flux Accelerator-Driven Neutron Irradiation Facility for Nuclear Plant Materials and Applied Neutron Science EPSRC
£43,848,865
Nov. 1, 2019 March 31, 2024 Active
79 Imaging and location of fast neutron emissions by real-time time-of-flight EPSRC
£1,061,834
Dec. 10, 2015 March 9, 2020 Closed
80 Imaging and location of fast neutron emissions by real-time time-of-flight EPSRC
£2,654,585
Dec. 10, 2015 March 9, 2020 Closed
Reset