Home Projects More like: Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance [Clear] # Title Funder Funding Start End Status 1 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £2,968,295 Feb. 1, 2011 Aug. 15, 2014 Closed 2 Next Generation Grid Scale Thermal Energy Storage Technologies (NexGen-TEST) EPSRC £1,969,690 April 29, 2014 Oct. 28, 2017 Closed 3 Next Generation Grid Scale Thermal Energy Storage Technologies (NexGen-TEST) EPSRC £4,924,225 April 29, 2014 Oct. 29, 2017 Closed 4 Oxycoal UK EPSRC £335,612 Jan. 1, 2007 June 29, 2009 Closed 5 Resilient Integrated-Coupled FOW platform design methodology (ResIn) EPSRC £1,623,950 July 2, 2017 Jan. 2, 2021 Closed 6 Resilient Integrated-Coupled FOW platform design methodology (ResIn) Newton Fund £4,059,875 July 2, 2017 Jan. 2, 2021 Closed 7 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 30, 2019 Closed 8 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 31, 2019 Closed 9 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC £1,513,108 Jan. 1, 2013 Oct. 31, 2016 Closed 10 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC £3,782,770 Jan. 1, 2013 Oct. 31, 2016 Closed 11 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC £2,222,520 Aug. 31, 2012 Aug. 30, 2016 Closed 12 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC £5,556,300 Aug. 31, 2012 Aug. 31, 2016 Closed 13 Novel thermodynamic cycles utilising waste BOS gas from an Integrated Steel Production Process Innovate UK £235,342 Feb. 1, 2014 Jan. 31, 2015 Closed 14 In-depth Studies of OxyCoal Combustion Processes through Numerical Modelling and 3D Flame Imaging EPSRC £610,168 Dec. 11, 2009 Jan. 10, 2014 Closed 15 In-depth Studies of OxyCoal Combustion Processes through Numerical Modelling and 3D Flame Imaging EPSRC £418,186 Nov. 1, 2009 May 30, 2013 Closed 16 In-depth Studies of OxyCoal Combustion Processes through Numerical Modelling and 3D Flame Imaging EPSRC £981,218 March 1, 2010 Feb. 28, 2014 Closed 17 In-depth Studies of OxyCoal Combustion Processes through Numerical Modelling and 3D Flame Imaging EPSRC £2,453,045 March 1, 2010 Feb. 28, 2014 Closed 18 Oxy-hybrid Power Cycle with Advanced Heat Recovery Network EPSRC £147,616 Feb. 24, 2014 Feb. 23, 2015 Closed 19 Integrated, Market-fit and Affordable Grid-scale Energy Storage (IMAGES) EPSRC £6,038,140 Aug. 31, 2012 June 29, 2018 Closed 20 Integrated, Market-fit and Affordable Grid-scale Energy Storage (IMAGES) EPSRC £15,095,350 Aug. 31, 2012 June 30, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »