Home Projects More like: Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters [Clear] # Title Funder Funding Start End Status 81 International Collaboration Sabbatical: To Foster Long-term Collaboration with Leading Control and Power Electronics Experts in the USA EPSRC £716,665 Jan. 16, 2012 April 9, 2012 Closed 82 International Collaboration Sabbatical: To Foster Long-term Collaboration with Leading Control and Power Electronics Experts in the USA EPSRC £530,625 April 9, 2012 April 30, 2013 Closed 83 Transformation of the Top and Tail of Energy Networks EPSRC £8,264,142 Sept. 30, 2011 Sept. 29, 2015 Closed 84 Transformation of the Top and Tail of Energy Networks EPSRC £20,660,355 Sept. 30, 2011 Sept. 30, 2015 Closed 85 EPSRC 1st Grant: "Compact Modular Multilevel Converters for Offshore Wind Integration" EPSRC £202,304 Sept. 30, 2017 Sept. 29, 2019 Closed 86 EPSRC 1st Grant: "Compact Modular Multilevel Converters for Offshore Wind Integration" EPSRC £505,760 Sept. 30, 2017 Sept. 30, 2019 Closed 87 Thin neutron detector on a chip utilising silicon carbide EPSRC £1,201,775 Sept. 30, 2018 June 30, 2021 Closed 88 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £1,209,122 March 31, 2020 March 30, 2023 Active 89 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £3,022,805 March 31, 2020 March 31, 2024 Active 90 Pulse quietening at source for higher-frequency power and signal switching EPSRC £1,603,372 June 16, 2013 June 15, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »