Home Projects More like: Power to Liquids Research Facility [Clear] # Title Funder Funding Start End Status 21 Commercial Demonstration Plant to Manufacture Synthetic Hydrocarbon Fuels from Renewable Power ("eFuels"): Phase-1A-Extended (Technology and Design - Catalyst Optimisation) Innovate UK £126,376 Jan. 1, 2021 March 30, 2021 Closed 22 Metal-hydrido intermediates in enzymes: atomic level mechanistic insight and technological applications of hydrogenases BBSRC £799,806 March 1, 2014 Dec. 31, 2017 Closed 23 Metal-hydrido intermediates in enzymes: atomic level mechanistic insight and technological applications of hydrogenases BBSRC £853,824 Jan. 14, 2014 Jan. 13, 2017 Closed 24 Renewable Ammonia - maximising the benefits of renewable energy production as a means of decarbonising fertilizer and food production Innovate UK £47,346 Feb. 1, 2013 May 30, 2013 Closed 25 Renewable Ammonia - maximising the benefits of renewable energy production as a means of decarbonising fertilizer and food production Innovate UK £118,365 Feb. 1, 2013 May 31, 2013 Closed 26 FEASIBILITY STUDY OF UREA FUEL CELL EPSRC £175,748 Sept. 30, 2007 Sept. 29, 2008 Closed 27 FEASIBILITY STUDY OF UREA FUEL CELL EPSRC £439,370 Sept. 30, 2007 Sept. 30, 2008 Closed 28 DualFlow: Dual circuit battery for hydrogen and value added chemical production Horizon Europe Guarantee £2,301,975 Sept. 30, 2022 Sept. 30, 2026 Active 29 Dual circuit flow battery for hydrogen and value added chemical production Horizon Europe Guarantee £2,175,890 Sept. 30, 2022 Sept. 30, 2026 Active 30 Zero-Chem: Zerogap bipolar membrane electrolyser for CO2 reduction to chemicals & fuels EPSRC £246,735 Sept. 30, 2022 Sept. 29, 2024 Active 31 Intensified Integrated Bio-Refinery EPSRC £235,506 Oct. 15, 2006 April 14, 2008 Closed 32 Intensified Integrated Bio-Refinery EPSRC £315,116 Jan. 29, 2007 Jan. 28, 2009 Closed 33 Intensified Integrated Bio-Refinery EPSRC £192,518 Oct. 1, 2006 March 1, 2008 Closed 34 Intensified Integrated Bio-Refinery EPSRC £28,424 May 31, 2006 May 30, 2008 Closed 35 Intensified Integrated Bio-Refinery EPSRC £239,878 April 30, 2007 Dec. 31, 2008 Closed 36 Intensified Integrated Bio-Refinery EPSRC £599,695 April 30, 2007 Dec. 31, 2008 Closed 37 Intensified Integrated Bio-Refinery EPSRC £787,790 Jan. 29, 2007 Jan. 28, 2009 Closed 38 Intensified Integrated Bio-Refinery EPSRC £481,295 Oct. 1, 2006 March 1, 2008 Closed 39 Intensified Integrated Bio-Refinery EPSRC £588,765 Oct. 15, 2006 April 15, 2008 Closed 40 Intensified Integrated Bio-Refinery EPSRC £71,060 May 31, 2006 May 31, 2008 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »