# Title Funder Funding Start End Status
81 Automated multi-dimensional mapping of dynamic laser-liquid interactions EPSRC
£603,257
Sept. 30, 2023 Jan. 31, 2026 Active
82 Coupling fluid and kinetic codes for laser-driven inertial fusion energy simulations EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
83 Modelling pulsar timing noise EPSRC
£0
Sept. 30, 2017 March 31, 2021 Closed
84 Cosmological Constraints on MeV-scale Dark Sectors STFC
£0
Sept. 30, 2018 March 30, 2022 Active
85 Cosmological Constraints on MeV-scale Dark Sectors STFC
£0
Sept. 30, 2018 March 31, 2022 Closed
86 3-D Effects on Tokamak Plasma Stability EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
87 Attosecond Electron Dynamics in Molecular and Condensed Phase Systems EPSRC
£29,192,545
May 31, 2011 May 31, 2017 Closed
88 Plasma agriculture for pesticide reduction STFC
£490,045
Sept. 23, 2018 Aug. 20, 2021 Closed
89 Plasma agriculture for pesticide reduction STFC
£1,235,760
Sept. 23, 2018 Aug. 21, 2021 Closed
90 A direct method for solving matrix Wiener-Hopf equations EPSRC
£443,695
Aug. 2, 2021 Jan. 21, 2023 Closed
91 Statistical Monitoring and Control of Nuclear Fusion Systems. EPSRC
£0
Sept. 30, 2019 March 31, 2024 Active
92 From conformal loop ensembles to conformal field theory EPSRC
£198,710
June 7, 2010 June 6, 2012 Closed
93 From conformal loop ensembles to conformal field theory EPSRC
£496,775
June 7, 2010 June 7, 2012 Closed
94 3rd INTERACT travel grant: Starting point for collaboration with a Japanese network in microplasmas EPSRC
£26,626
March 25, 2006 June 23, 2006 Closed
95 Nuclear Structure, Astrophysics and Reactions (NuSTAR) at FAIR STFC
£7,975,025
Feb. 24, 2010 March 31, 2016 Closed
96 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC
£706,310
Oct. 14, 2019 June 29, 2023 Active
97 Extreme Loading on Floating Offshore Wind Turbines (FOWTs) under Complex Environmental Conditions EPSRC
£88,548
March 2, 2020 March 1, 2023 Active
98 Extreme Loading on Floating Offshore Wind Turbines (FOWTs) under Complex Environmental Conditions EPSRC
£126,780
Nov. 26, 2019 March 23, 2023 Active
99 Extreme Loading on Floating Offshore Wind Turbines (FOWTs) under Complex Environmental Conditions EPSRC
£779,382
March 31, 2020 March 30, 2023 Active
100 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC
£664,316
March 31, 2020 March 30, 2023 Active
Reset