Home Projects More like: Assessing Hedging Risks of Novel Reactor Designs [Clear] # Title Funder Funding Start End Status 81 Irradiation Effects on Flow Localisation in Zirconium Alloys EPSRC £1,594,475 March 31, 2011 March 31, 2015 Closed 82 Defining a Draft for a Zero Power Reactor Experiment for Molten Salt Reactors EPSRC £2,568,968 June 30, 2021 June 29, 2024 Active 83 Defining a Draft for a Zero Power Reactor Experiment for Molten Salt Reactors EPSRC £6,422,420 June 30, 2021 June 30, 2024 Active 84 Innovative Machining of Refractory Metals EPSRC £0 Nov. 25, 2019 May 24, 2023 Closed 85 Modelling radiation resistant low activation High Entropy Alloys EPSRC £675,388 Dec. 1, 2019 May 30, 2023 Active 86 Modelling radiation resistant low activation High Entropy Alloys EPSRC £44,154 Oct. 20, 2019 April 19, 2023 Active 87 Modelling radiation resistant low activation High Entropy Alloys EPSRC £1,688,470 Dec. 1, 2019 May 31, 2023 Closed 88 Development of an in-situ characterisation facility for both proton and neutron irradiation EPSRC £6,481,540 Sept. 30, 2021 March 31, 2024 Active 89 Thermo-mechanical property measurement of nuclear graphites at elevated temperatures EPSRC £0 Sept. 30, 2019 Dec. 31, 2023 Active 90 Adaptive hierarchical radiation transport methods to meet future challenges in reactor physics EPSRC £5,796,670 Dec. 1, 2011 Nov. 30, 2015 Closed 91 Simulated Used Nuclear Fuel Dissolution as a Function of Fuel Chemistry and Near Field Conditions EPSRC £1,694,920 April 8, 2018 April 8, 2021 Closed 92 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC £628,950 June 30, 2022 June 29, 2025 Active 93 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC £3,144,750 June 30, 2022 June 30, 2025 Active 94 Thermal transient effects in fusion front wall/breeder blanket components EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 95 Thermal transient effects in fusion front wall/breeder blanket components EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 96 UNIGRAF: Understanding and Improving Graphite for Nuclear Fission EPSRC £2,437,695 Aug. 23, 2015 Feb. 23, 2019 Closed 97 UTGARD LAB PHASE II: A SIMFUEL FABRICATION & CHARACTERISATION FACILITY EPSRC £1,504,110 Nov. 1, 2019 May 30, 2023 Active 98 UTGARD LAB PHASE II: A SIMFUEL FABRICATION & CHARACTERISATION FACILITY EPSRC £3,760,275 Nov. 1, 2019 June 30, 2023 Closed 99 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC £0 Sept. 30, 2018 July 30, 2022 Active 100 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC £0 Sept. 30, 2018 March 30, 2022 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »