Home Projects More like: Rapid Electric-vehicle Brake Optimisation System (REBOS) [Clear] # Title Funder Funding Start End Status 61 HYDROFLEX MAINLINE TESTING Innovate UK £700,000 June 30, 2019 July 30, 2020 Closed 62 HYDROFLEX MAINLINE TESTING Innovate UK £1,750,000 June 30, 2019 July 31, 2020 Closed 63 Air Handling System Optimisation for Fuel Cell Applications EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 64 Hydrogen Prototype Equipment for Refuelling - HyPER Innovate UK £127,816 June 30, 2021 April 29, 2022 Active 65 Accelerated Multiscale Modelling of Batteries (AMMBa) Innovate UK £139,620 Sept. 30, 2020 March 30, 2021 Closed 66 Accelerated Multiscale Modelling of Batteries (AMMBa) Innovate UK £698,100 Sept. 30, 2020 March 31, 2021 Closed 67 High Performance Electric Compressor (HiComp2) Innovate UK £5,224,332 July 31, 2019 March 30, 2022 Closed 68 Investigating the Application of Flow-Batteries in Transport Applications EPSRC £0 May 31, 2019 May 30, 2023 Active 69 En-ComE: Energy Harvesting Powered Wireless Monitoring Systems Based on Integrated Smart Composite Structures and Energy-Aware Architecture EPSRC £1,260,578 April 14, 2014 Oct. 13, 2017 Closed 70 En-ComE: Energy Harvesting Powered Wireless Monitoring Systems Based on Integrated Smart Composite Structures and Energy-Aware Architecture EPSRC £377,882 March 31, 2014 Aug. 30, 2017 Closed 71 En-ComE: Energy Harvesting Powered Wireless Monitoring Systems Based on Integrated Smart Composite Structures and Energy-Aware Architecture EPSRC £3,151,445 April 14, 2014 Oct. 14, 2017 Closed 72 SMART-NoDE: Sensor Monitoring And ReporTing Innovate UK £322,654 March 31, 2017 March 30, 2018 Closed 73 SMART-NoDE: Sensor Monitoring And ReporTing Innovate UK £806,635 March 31, 2017 March 31, 2018 Closed 74 Real-time Virtual Prototypes for the Power Electronics Supply Chain EPSRC £5,182,945 June 30, 2023 June 30, 2026 Active 75 Connected Smart Charging Innovate UK £1,289,080 Sept. 30, 2020 March 31, 2021 Closed 76 The Design and Development of Multivariable Controls with the Application for Energy Management of Hybrid Electric Vehicles. EPSRC £1,023,645 June 21, 2010 Dec. 21, 2011 Closed 77 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £9,965,976 March 31, 2010 Dec. 31, 2015 Closed 78 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £18,543,684 March 31, 2010 Dec. 31, 2015 Closed 79 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £30,906,140 March 31, 2010 Dec. 31, 2015 Closed 80 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £16,609,960 March 31, 2010 Dec. 31, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »