Home Projects More like: TOBEV: Thermally Optimised Battery Electric Vehicle [Clear] # Title Funder Funding Start End Status 41 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £1,081,208 July 31, 2016 April 29, 2020 Closed 42 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £2,703,020 July 31, 2016 April 30, 2020 Closed 43 Mechanically Decoupled Electric Turbocharger for Optimal IC Engines Efficiency Innovate UK £1,741,894 Aug. 31, 2015 Nov. 30, 2017 Closed 44 Data-Driven Predictive Control for Ensuring Grid Security with High Penetration of Wind Energy EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 45 An Information Theory Inspired Study of Memristor Devices and their Potential Use in Neuromorphic Circuits EPSRC £0 Sept. 30, 2019 June 29, 2023 Active 46 Integrated Propulsion and Charging System for Low Carbon Vehicles Innovate UK £1,336,664 Sept. 30, 2012 March 30, 2015 Closed 47 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £2,594,834 Sept. 30, 2020 Sept. 29, 2024 Active 48 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £6,487,085 Sept. 30, 2020 Sept. 30, 2024 Active 49 External Heat Engine mCHP EPSRC £880,904 Feb. 1, 2018 Jan. 31, 2022 Closed 50 External Heat Engine mCHP EPSRC £2,202,260 Feb. 1, 2018 Jan. 31, 2022 Closed 51 Centre of Excellence for Hybrid Thermal Propulsion Systems EPSRC £9,587,964 April 30, 2021 April 29, 2026 Active 52 Centre of Excellence for Hybrid Thermal Propulsion Systems EPSRC £23,969,910 April 30, 2021 April 30, 2026 Active 53 EV ASSIST – Feasibility Study of Vehicle-User-Network Optimisation Innovate UK £196,248 Sept. 30, 2020 March 30, 2021 Closed 54 19T Range Extender Electric Truck Research Innovate UK £9,880,470 Aug. 31, 2018 March 31, 2022 Closed 55 Responsive Algorithmic Enterprise (RAE) EPSRC £164,758 March 31, 2017 March 30, 2018 Closed 56 Responsive Algorithmic Enterprise (RAE) EPSRC £411,895 March 31, 2017 March 31, 2018 Closed 57 VIPER - Vehicle Integrated Powertrain Energy Recovery Innovate UK £13,114,090 Aug. 31, 2010 Nov. 30, 2013 Closed 58 Data-driven Optimisation of Offshore Wind Operations & Maintenance EPSRC £0 Aug. 31, 2021 Aug. 31, 2025 Active 59 Exploring Applications of Additive Manufacturing for Flow Control, Heat Transfer and Mass Transfer EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 60 Zero Carbon Tariffs with Cashback for V2X enabled Non-domestic Customers Innovate UK £701,325 Aug. 31, 2022 Aug. 31, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »