# Title Funder Funding Start End Status
81 Electrochemical modification and deposition of bifunctional metal-alloys and metal-oxides EPSRC
£0
Sept. 30, 2018 March 30, 2022 Active
82 Condition Monitoring Power Electronics for Reliability (COMPERE) EPSRC
£1,452,045
Nov. 1, 2007 Oct. 31, 2010 Closed
83 Condition Monitoring Power Electronics for Reliability (COMPERE) EPSRC
£1,313,875
Sept. 3, 2007 Sept. 3, 2010 Closed
84 Advanced Functional Materials Spectroscopy: Lab-based X-ray Absorption EPSRC
£1,381,714
July 31, 2021 Jan. 31, 2025 Active
85 A first principles study of electric double layer capacitors EPSRC
£194,772
Sept. 30, 2015 March 30, 2017 Closed
86 A first principles study of electric double layer capacitors EPSRC
£486,930
Sept. 30, 2015 March 31, 2017 Closed
87 CIRCULAR ECOLOGICAL ESSENTIAL & CRITICAL RAW MATERIALS (ROTATE) Horizon Europe Guarantee
£2,438,115
Aug. 31, 2022 Aug. 31, 2026 Active
88 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC
£2,398,464
Nov. 1, 2018 Oct. 31, 2022 Active
89 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC
£5,996,160
Nov. 1, 2018 Oct. 31, 2022 Closed
90 Modelling of Advanced Functional Materials using Terascale Computing EPSRC
£1,264,492
June 30, 2008 June 29, 2013 Closed
91 Modelling of Advanced Functional Materials using Terascale Computing EPSRC
£1,045,012
Nov. 1, 2008 Oct. 31, 2013 Closed
92 Bioinspired green manufacturing of next generation energy storage materials EPSRC
£330,118
April 14, 2018 March 30, 2020 Closed
93 Bioinspired green manufacturing of next generation energy storage materials EPSRC
£825,295
April 14, 2018 March 31, 2020 Closed
94 Determination of Surface and Interface Processes in Materials Science EPSRC
£4,641,648
July 31, 2009 July 30, 2013 Closed
95 Determination of Surface and Interface Processes in Materials Science EPSRC
£11,604,120
July 31, 2009 July 31, 2013 Closed
96 A solid-state NMR instrument for Northern Ireland EPSRC
£1,912,110
Feb. 1, 2022 Jan. 31, 2024 Active
97 Rational design of solid-state semiconductor-sensitized solar cells: from materials modelling to device fabrication EPSRC
£1,978,978
Sept. 30, 2012 March 30, 2017 Closed
98 Rational design of solid-state semiconductor-sensitized solar cells: from materials modelling to device fabrication EPSRC
£4,947,445
Sept. 30, 2012 March 31, 2017 Closed
99 Silicon Compatible GaN Power Electronics EPSRC
£12,393,434
March 1, 2013 Aug. 30, 2018 Closed
100 Silicon Compatible GaN Power Electronics EPSRC
£30,983,585
March 1, 2013 Aug. 31, 2018 Closed
Reset