Home Projects More like: Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques [Clear] # Title Funder Funding Start End Status 1 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £2,548,872 Sept. 30, 2014 Sept. 29, 2016 Closed 2 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £1,455,818 Sept. 30, 2016 June 29, 2019 Closed 3 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £6,372,180 Sept. 30, 2014 Sept. 30, 2016 Closed 4 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 30, 2019 Closed 5 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 31, 2019 Closed 6 Feasibility of a wetting layer absorption carbon capture process based on chemical solvents EPSRC £2,098,370 April 30, 2013 Sept. 30, 2015 Closed 7 Feasibility of a wetting layer absorption carbon capture process based on chemical solvents EPSRC £2,842,165 Sept. 30, 2012 April 30, 2013 Closed 8 Feasibility experiments to quantify the compatibility of C-Capture’s solvent technology with the requirements of the glass manufacturing industry Innovate UK £119,200 Sept. 30, 2020 Dec. 31, 2020 Closed 9 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC £1,513,108 Jan. 1, 2013 Oct. 31, 2016 Closed 10 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC £3,782,770 Jan. 1, 2013 Oct. 31, 2016 Closed 11 Impact of High Concentrations of SO2 and SO3 in Carbon Capture Applications and its Mitigation EPSRC £869,785 April 30, 2009 April 30, 2011 Closed 12 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC £2,222,520 Aug. 31, 2012 Aug. 30, 2016 Closed 13 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC £5,556,300 Aug. 31, 2012 Aug. 31, 2016 Closed 14 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC £960,510 Jan. 1, 2014 Dec. 31, 2016 Closed 15 Magnetic metal-organic framework composites for pollutant gas capture EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 16 Magnetic metal-organic framework composites for pollutant gas capture EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 17 Carbon Capture in the Refining Process (First Grant Scheme) EPSRC £500,995 Sept. 30, 2012 Sept. 30, 2013 Closed 18 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £2,199,782 Dec. 1, 2014 May 30, 2018 Closed 19 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £5,499,455 Dec. 1, 2014 May 31, 2018 Closed 20 In situ pilot-scale demonstration of a novel mineral processing biotechnology for recovering metals from lateritic ores (International) NERC £198,982 Nov. 1, 2017 Dec. 31, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »