# Title Funder Funding Start End Status
81 EcoSTAR: Ecosystem level importance of STructures as Artificial Reefs NERC
£2,488,625
June 28, 2020 March 31, 2025 Active
82 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK
£9,965,976
March 31, 2010 Dec. 31, 2015 Closed
83 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK
£18,543,684
March 31, 2010 Dec. 31, 2015 Closed
84 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK
£30,906,140
March 31, 2010 Dec. 31, 2015 Closed
85 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK
£16,609,960
March 31, 2010 Dec. 31, 2015 Closed
86 Fundamentals of the Behaviour of Fission Products in Oxide Nuclear Fuels EPSRC
£3,901,760
July 31, 2013 Aug. 6, 2014 Closed
87 Effect of sediment and groundwater flow heterogeneity on accurately modelling radionuclide transport at UK nuclear sites EPSRC
£0
Sept. 30, 2020 May 31, 2024 Active
88 Performance and Reliability of Metallic Materials for Nuclear Fission Power Generation EPSRC
£1,718,140
June 30, 2010 March 31, 2015 Closed
89 Radiation Damage in Nanoporous Nuclear Materials EPSRC
£1,952,755
Sept. 30, 2015 March 31, 2020 Closed
90 ClearSeas NERC
£100,220
Jan. 1, 2016 May 31, 2016 Closed
91 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
92 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
93 A centre for Advanced Digital Radiometric Instrumentation for Applied Nuclear Activities (ADRIANA) EPSRC
£5,200,000
Feb. 25, 2014 April 15, 2014 Closed
94 NaREC Marine Testing Facility (Nautilus) Innovate UK
£22,514,716
Aug. 31, 2009 Sept. 29, 2013 Closed
95 NaREC Marine Testing Facility (Nautilus) Innovate UK
£56,286,790
Aug. 31, 2009 Sept. 30, 2013 Closed
96 Wind Turbine Blade Repair Technology Innovate UK
£172,074
Sept. 30, 2020 March 30, 2021 Closed
97 Wind Turbine Blade Repair Technology Innovate UK
£430,185
Sept. 30, 2020 March 31, 2021 Closed
98 Fault tolerant control for increased safety and security of nuclear power plants EPSRC
£878,499
Dec. 1, 2018 Feb. 28, 2022 Closed
99 Fault tolerant control for increased safety and security of nuclear power plants EPSRC
£472,296
Sept. 30, 2018 Aug. 30, 2023 Active
100 Fault tolerant control for increased safety and security of nuclear power plants EPSRC
£1,464,165
Dec. 1, 2018 Feb. 28, 2022 Closed
Reset