Home Projects More like: Wireless Power Transfer (WPT) for Electric Vehicles (EVs) [Clear] # Title Funder Funding Start End Status 81 Electric Fleets with On-site Renewable Energy Sources (EFORES): Data-driven Dynamic Dispatching and Charging under Uncertainties EPSRC £100,764 Dec. 1, 2021 Jan. 31, 2023 Active 82 Electric Fleets with On-site Renewable Energy Sources (EFORES): Data-driven Dynamic Dispatching and Charging under Uncertainties EPSRC £251,910 Feb. 1, 2022 Jan. 31, 2023 Closed 83 Autonomous Charging For Efficient & Safe Vehicle Charging In Fleet Depots And On-Street (Public) Innovate UK £296,275 Sept. 30, 2020 Dec. 31, 2020 Closed 84 FreeWire: flexible, mobile EV charging for UK streets Innovate UK £296,985 Jan. 1, 2019 March 31, 2019 Closed 85 XL-Connect Large scale system approach for advanced charging solutions Horizon Europe Guarantee £521,660 Jan. 1, 2023 June 30, 2026 Active 86 Solar Powered Electric-Bike Charge Station (SPEBCS) Innovate UK £49,000 March 1, 2016 Aug. 30, 2016 Closed 87 Solar Powered Electric-Bike Charge Station (SPEBCS) Innovate UK £122,500 March 1, 2016 Aug. 31, 2016 Closed 88 Applying a flexibility capital framework to drive an inclusive energy transition EPSRC £0 Sept. 26, 2021 Sept. 29, 2025 Active 89 Applying a flexibility capital framework to drive an inclusive energy transition EPSRC £0 Sept. 30, 2021 July 1, 2022 Closed 90 Flywheel Fast Charging Station for Electric Vehicles Innovate UK £0 Aug. 31, 2019 Oct. 31, 2019 Closed 91 From 2D to 4D: correlative imaging and modelling for next-generation automotive lithium-ion batteries EPSRC £2,242,990 June 30, 2023 June 30, 2026 Active 92 Energy Superhub Oxford: Unlocking scalable solutions for EV charging, battery storage and heat through transmission connection and machine learning Innovate UK £22,729,890 March 31, 2019 March 30, 2023 Active 93 Linear and Efficient RF Transmitters with Digital Pre-Distortion and Supply Modulation EPSRC £1,694,272 June 30, 2023 June 30, 2026 Active 94 Methanol powered zero-carbon vessel design study Innovate UK £323,161 Sept. 30, 2022 Sept. 29, 2023 Active 95 Methanol powered zero-carbon vessel design study Innovate UK £1,615,805 Sept. 30, 2022 Sept. 30, 2023 Closed 96 Feasibility Study of the Potential for Electric Vehicle Batteries to be Used for Network Support EPSRC £307,504 March 31, 2008 Sept. 29, 2009 Closed 97 Feasibility Study of the Potential for Electric Vehicle Batteries to be Used for Network Support EPSRC £768,760 March 31, 2008 Sept. 30, 2009 Closed 98 Fabrication of High Speed GaN-based Transistors and DC-to-DC Converters. EPSRC £0 Sept. 24, 2017 Sept. 29, 2021 Closed 99 Interface and Network Infrastructure to Support EV Participation in Smart Grids EPSRC £1,881,776 June 30, 2013 May 30, 2017 Closed 100 Interface and Network Infrastructure to Support EV Participation in Smart Grids EPSRC £4,704,440 June 30, 2013 May 31, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »