# Title Funder Funding Start End Status
61 Engineering halide perovskites for artificial leaves EPSRC
£1,265,120
March 31, 2018 Oct. 31, 2019 Closed
62 Feasibility of the use of frozen walls in molten salt fast reactors (MSFR-FW) EPSRC
£403,472
July 2, 2017 July 1, 2018 Closed
63 Feasibility of the use of frozen walls in molten salt fast reactors (MSFR-FW) EPSRC
£1,008,680
July 2, 2017 July 2, 2018 Closed
64 Mechanisms of Retention and Transport of Fission Products in Virgin and Irradiated Nuclear Graphite EPSRC
£1,599,610
March 1, 2018 Sept. 30, 2021 Closed
65 Behaviour of UK Specific Spent Fuels Under Conditions Relevant to Geological Disposal. EPSRC
£3,644,210
Aug. 23, 2011 Jan. 31, 2016 Closed
66 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£3,848,592
March 1, 2016 June 29, 2020 Closed
67 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£226,712
June 30, 2020 Dec. 31, 2020 Closed
68 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£566,780
June 30, 2020 Dec. 31, 2020 Closed
69 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£9,621,480
March 1, 2016 June 30, 2020 Closed
70 Newton Bhabha Industrial Waste: Bio-integrated Valorisation of India's Municipal Solid Waste to Renewable Feedstocks BBSRC
£1,215,994
Aug. 15, 2018 March 30, 2022 Closed
71 Adaptive hierarchical radiation transport methods to meet future challenges in reactor physics EPSRC
£5,796,670
Dec. 1, 2011 Nov. 30, 2015 Closed
72 EPSRC Centre for Doctoral Training in Nuclear Energy Futures EPSRC
£12,533,795
March 31, 2019 Sept. 29, 2027 Active
73 EPSRC Centre for Doctoral Training in Nuclear Energy Futures EPSRC
£32,037,059
March 31, 2019 Sept. 30, 2027 Active
74 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£982,574
March 17, 2016 March 16, 2020 Closed
75 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£2,456,435
March 17, 2016 March 16, 2020 Closed
76 Low Cost High Performance Novel Catalysts for Direct Alcohol Alkaline Fuel Cells using anion exchange membrane and bio-fuels EPSRC
£1,072,296
Aug. 23, 2011 Oct. 31, 2014 Closed
77 Low Cost High Performance Novel Catalysts for Direct Alcohol Alkaline Fuel Cells using anion exchange membrane and bio-fuels EPSRC
£2,680,740
Aug. 23, 2011 Oct. 31, 2014 Closed
78 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC
£778,028
Jan. 1, 2012 June 29, 2015 Closed
79 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC
£1,945,070
Jan. 1, 2012 June 30, 2015 Closed
80 Radiochemical Facilities for the Molten Salts in Nuclear Technologies Network EPSRC
£11,662,850
Nov. 1, 2019 April 30, 2023 Closed
Reset