# Title Funder Funding Start End Status
21 Understanding the fatigue behavior of tidal turbine blades EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
22 A numerical study on aerofoil trailing edge noise and its reduction methods for the next-generation wind turbines EPSRC
£0
April 29, 2018 April 29, 2021 Closed
23 Establishing the performance implications of employing lower cost methods for the manufacture of large scale tidal turbine rotors (EPICTidal) EPSRC
£157,488
April 30, 2017 April 29, 2018 Closed
24 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK
£2,943,394
Jan. 1, 2019 Dec. 31, 2020 Closed
25 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK
£7,287,715
Jan. 1, 2019 Dec. 31, 2020 Closed
26 Measured dynamic loading and power performance of tidal turbines in realistic flow conditions EPSRC
£371,400
Sept. 30, 2014 Sept. 29, 2015 Closed
27 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK
£1,026,654
June 30, 2022 June 29, 2024 Active
28 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK
£5,133,270
June 30, 2022 June 30, 2024 Active
29 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC
£1,099,078
Jan. 1, 2016 June 29, 2019 Closed
30 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC
£2,747,695
Jan. 1, 2016 June 30, 2019 Closed
31 the noise reduction of wind turbine blade noise emission EPSRC
£0
Sept. 30, 2017 March 30, 2021 Closed
32 Development of in situ repair of damaged wind turbine blades Innovate UK
£241,392
May 31, 2010 Nov. 30, 2011 Closed
33 Development of in situ repair of damaged wind turbine blades Innovate UK
£603,480
May 31, 2010 Nov. 30, 2011 Closed
34 Engineered textile blade with actively controlled surface/profile Innovate UK
£231,556
April 30, 2015 Jan. 31, 2016 Closed
35 Engineered textile blade with actively controlled surface/profile Innovate UK
£578,890
April 30, 2015 Jan. 31, 2016 Closed
36 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC
£395,774
Jan. 1, 2018 Dec. 31, 2019 Closed
37 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC
£989,435
Jan. 1, 2018 Dec. 31, 2019 Closed
38 Wind blade design for disassembly EPSRC
£0
Sept. 19, 2021 Sept. 29, 2025 Active
39 Wind blade design for disassembly EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
40 Demonstrator for robotic inspection and maintenance of offshore wind turbine blades Innovate UK
£1,495,644
March 1, 2019 Feb. 28, 2021 Closed
Reset