Home Projects More like: Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation [Clear] # Title Funder Funding Start End Status 21 Understanding the fatigue behavior of tidal turbine blades EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 22 A numerical study on aerofoil trailing edge noise and its reduction methods for the next-generation wind turbines EPSRC £0 April 29, 2018 April 29, 2021 Closed 23 Establishing the performance implications of employing lower cost methods for the manufacture of large scale tidal turbine rotors (EPICTidal) EPSRC £157,488 April 30, 2017 April 29, 2018 Closed 24 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK £2,943,394 Jan. 1, 2019 Dec. 31, 2020 Closed 25 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK £7,287,715 Jan. 1, 2019 Dec. 31, 2020 Closed 26 Measured dynamic loading and power performance of tidal turbines in realistic flow conditions EPSRC £371,400 Sept. 30, 2014 Sept. 29, 2015 Closed 27 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK £1,026,654 June 30, 2022 June 29, 2024 Active 28 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK £5,133,270 June 30, 2022 June 30, 2024 Active 29 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC £1,099,078 Jan. 1, 2016 June 29, 2019 Closed 30 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC £2,747,695 Jan. 1, 2016 June 30, 2019 Closed 31 the noise reduction of wind turbine blade noise emission EPSRC £0 Sept. 30, 2017 March 30, 2021 Closed 32 Development of in situ repair of damaged wind turbine blades Innovate UK £241,392 May 31, 2010 Nov. 30, 2011 Closed 33 Development of in situ repair of damaged wind turbine blades Innovate UK £603,480 May 31, 2010 Nov. 30, 2011 Closed 34 Engineered textile blade with actively controlled surface/profile Innovate UK £231,556 April 30, 2015 Jan. 31, 2016 Closed 35 Engineered textile blade with actively controlled surface/profile Innovate UK £578,890 April 30, 2015 Jan. 31, 2016 Closed 36 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC £395,774 Jan. 1, 2018 Dec. 31, 2019 Closed 37 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC £989,435 Jan. 1, 2018 Dec. 31, 2019 Closed 38 Wind blade design for disassembly EPSRC £0 Sept. 19, 2021 Sept. 29, 2025 Active 39 Wind blade design for disassembly EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 40 Demonstrator for robotic inspection and maintenance of offshore wind turbine blades Innovate UK £1,495,644 March 1, 2019 Feb. 28, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »