Home Projects More like: Development of an integrated hydro-environmental model for predicting dynamic bacterial fluxes from catchment to coast [Clear] # Title Funder Funding Start End Status 61 EverDrill: Accessing the interior and bed of a Himalayan debris-covered glacier to forecast future mass loss NERC £2,255,905 Sept. 30, 2016 Sept. 30, 2019 Closed 62 EverDrill: Accessing the interior and bed of a Himalayan debris-covered glacier to forecast future mass loss NERC £613,730 Sept. 30, 2016 Aug. 31, 2019 Closed 63 Social-economic-environmental trade-offs in managing the Land-River-Interface NERC £1,215,925 Feb. 13, 2019 Feb. 12, 2022 Closed 64 The impact of small impoundments and connectivity loss on fishdistribution and abundance in river ecosystems: leveraging cutting edge geospatial model NERC £0 Sept. 30, 2022 March 31, 2026 Active 65 [WATER] Optimising biological nutrient removal processes in a future of low carbon and low cost in the water industry NERC £134,614 March 1, 2012 Feb. 29, 2016 Closed 66 Modelling the Mixing and Erosion at the Head of Gravity Currents EPSRC £324,697 May 31, 2023 May 30, 2026 Active 67 Modelling the Mixing and Erosion at the Head of Gravity Currents EPSRC £1,623,485 June 30, 2023 June 30, 2026 Active 68 Deploying novel remote sensing solutions to increase the efficiency of dredging operations and coastal management at the port of Beira, Mozambique Innovate UK £119,224 April 30, 2020 April 29, 2021 Closed 69 EPSRC Centre for Doctoral Training in Fluid Dynamics at Leeds EPSRC £7,882,534 March 31, 2014 July 30, 2023 Active 70 The mechanism of oxygen sensing by the global transcriptional regulator FNR BBSRC £1,380,955 March 31, 2010 March 31, 2013 Closed 71 The mechanism of oxygen sensing by the global transcriptional regulator FNR BBSRC £1,893,130 Sept. 30, 2009 Sept. 30, 2012 Closed 72 Uncertainty analysis of hierarchical energy systems models: Models versus real energy systems EPSRC £734,868 May 4, 2014 Sept. 10, 2016 Closed 73 Uncertainty analysis of hierarchical energy systems models: Models versus real energy systems EPSRC £315,250 Sept. 11, 2016 Sept. 21, 2018 Closed 74 Uncertainty analysis of hierarchical energy systems models: Models versus real energy systems EPSRC £788,125 Sept. 11, 2016 Sept. 22, 2018 Closed 75 Uncertainty analysis of hierarchical energy systems models: Models versus real energy systems EPSRC £1,837,170 May 4, 2014 Sept. 11, 2016 Closed 76 Infrastructure for Port And Coastal cities and Towns network (iPACT) EPSRC £938,914 March 1, 2022 Feb. 29, 2024 Active 77 Sensitivity of post-storm surge dune recovery to geomorphological variability NERC £247,385 March 24, 2014 March 23, 2015 Closed 78 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £1,709,364 Sept. 27, 2012 Feb. 27, 2016 Closed 79 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £4,273,410 Sept. 27, 2012 Feb. 27, 2016 Closed 80 BOULDER: Accounting for BOUlders in Landslide-flood Disaster Evaluation and Resilience NERC £1,264,355 Sept. 30, 2018 Oct. 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »