Home Projects More like: The Effects of Realistic Tidal Flows on the Performance and Structural Integrity of Tidal Stream Turbines [Clear] # Title Funder Funding Start End Status 1 The Effects of Realistic Tidal Flows on the Performance and Structural Integrity of Tidal Stream Turbines EPSRC £2,778,744 June 30, 2012 Sept. 29, 2015 Closed 2 TripleOhm: Distribution substation monitoring Innovate UK £1,080,000 May 31, 2017 May 30, 2018 Closed 3 TripleOhm: Distribution substation monitoring ISCF £2,700,000 May 31, 2017 May 31, 2018 Closed 4 Connectivity of Hard Substrate Assemblages in the North Sea (CHASANS) NERC £1,130,598 May 31, 2020 May 30, 2023 Active 5 Connectivity of Hard Substrate Assemblages in the North Sea (CHASANS) NERC £145,050 Jan. 1, 2020 Dec. 31, 2022 Active 6 Connectivity of Hard Substrate Assemblages in the North Sea (CHASANS) NERC £210,472 May 31, 2020 May 30, 2023 Active 7 Connectivity of Hard Substrate Assemblages in the North Sea (CHASANS) NERC £362,625 Jan. 1, 2020 Dec. 31, 2022 Closed 8 Connectivity of Hard Substrate Assemblages in the North Sea (CHASANS) NERC £2,826,495 May 31, 2020 May 31, 2024 Active 9 Connectivity of Hard Substrate Assemblages in the North Sea (CHASANS) NERC £526,180 May 31, 2020 May 31, 2024 Active 10 Dynamic Loadings on Turbines in a Tidal Array (DyLoTTA) EPSRC £1,607,090 June 30, 2016 March 30, 2020 Closed 11 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £1,709,364 Sept. 27, 2012 Feb. 27, 2016 Closed 12 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £4,273,410 Sept. 27, 2012 Feb. 27, 2016 Closed 13 EcoWatt2050 EPSRC £1,895,310 March 1, 2014 Oct. 31, 2017 Closed 14 EcoWatt2050 EPSRC £4,738,275 March 1, 2014 Oct. 31, 2017 Closed 15 Measured dynamic loading and power performance of tidal turbines in realistic flow conditions EPSRC £371,400 Sept. 30, 2014 Sept. 29, 2015 Closed 16 A feasibility study for establishing a design tool for floating tidal energy system EPSRC £231,708 Oct. 30, 2014 Oct. 31, 2015 Closed 17 A feasibility study for establishing a design tool for floating tidal energy system Newton Fund £579,270 Oct. 30, 2014 Oct. 31, 2015 Closed 18 Condition monitoring and lifetime prognosis of electrical machines EPSRC £201,594 March 20, 2017 Aug. 2, 2018 Closed 19 Condition monitoring and lifetime prognosis of electrical machines EPSRC £503,985 March 20, 2017 Aug. 3, 2018 Closed 20 United Kingdom Centre for Marine Energy Research: The all UK waters, combined, current and wave test facility. EPSRC £30,000,305 Sept. 30, 2010 Feb. 28, 2011 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »