# Title Funder Funding Start End Status
1 Carbon Nanotube Based Textiles for Energy Storage Applications EPSRC
£509,816
Sept. 30, 2013 March 30, 2017 Closed
2 Production engineering research for the manufacture of novel electronically functional yarns for multifunctional smart textiles EPSRC
£6,614,520
July 31, 2019 July 31, 2023 Closed
3 Next Generation Materials Chemistry EPSRC
£0
Sept. 30, 2019 June 29, 2023 Active
4 Crossing Boundaries in Energy Storage EPSRC
£2,781,852
Jan. 1, 2014 April 29, 2016 Closed
5 Crossing Boundaries in Energy Storage EPSRC
£6,078,432
July 31, 2011 Dec. 31, 2013 Closed
6 Crossing Boundaries in Energy Storage EPSRC
£6,954,630
Jan. 1, 2014 April 30, 2016 Closed
7 Crossing Boundaries in Energy Storage EPSRC
£15,196,080
July 31, 2011 Dec. 31, 2013 Closed
8 Role of Electrocatalysts in the Electrochemistry of Oxygen in Non-Aqueous Electrolytes EPSRC
£708,592
March 31, 2013 Sept. 29, 2016 Closed
9 Role of Electrocatalysts in the Electrochemistry of Oxygen in Non-Aqueous Electrolytes EPSRC
£1,771,480
March 31, 2013 Sept. 30, 2016 Closed
10 Metal-Organic Frameworks based membranes for gas separation in Li-air batteries EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
11 Nanotubes for Carbon Capture EPSRC
£402,050
Nov. 1, 2010 April 29, 2012 Closed
12 Nanotubes for Carbon Capture EPSRC
£1,005,125
Nov. 1, 2010 April 30, 2012 Closed
13 A high performance energy storage device using novel patented electrode technology. EPSRC
£232,934
July 4, 2012 Aug. 30, 2013 Closed
14 A high performance energy storage device using novel patented electrode technology. EPSRC
£582,335
July 4, 2012 Aug. 31, 2013 Closed
15 Graphene enabled next generation battery technology EPSRC
£103,482
June 29, 2015 Dec. 29, 2015 Closed
16 Graphene enabled next generation battery technology EPSRC
£258,705
June 29, 2015 Dec. 29, 2015 Closed
17 Mechanisms and Synthesis of Materials for Next-Generation Lithium Batteries Using Flame Spray Pyrolysis EPSRC
£775,978
Feb. 1, 2021 Jan. 31, 2024 Active
18 Mechanisms and Synthesis of Materials for Next-Generation Lithium Batteries Using Flame Spray Pyrolysis EPSRC
£1,939,945
Feb. 1, 2021 July 31, 2024 Active
19 Enabling next generation lithium batteries EPSRC
£13,604,609
Oct. 20, 2015 April 19, 2022 Closed
20 Enabling next generation lithium batteries EPSRC
£34,023,885
Oct. 20, 2015 April 20, 2022 Closed
Reset