# Title Funder Funding Start End Status
81 CFD Modelling of the acoustic response of sprays EPSRC
£194,258
Jan. 15, 2016 July 13, 2017 Closed
82 The cosmic evolution of Supermassive Black holes: A panchromatic study of the nuclear environment STFC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
83 Modelling wave propagation through broken ice EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
84 Coarse Approximator Compilation EPSRC
£499,080
March 31, 2017 Sept. 30, 2018 Closed
85 Further Development and Applications of Highdimensional Quantum Mechanics with Coupled Coherent States. EPSRC
£586,800
May 23, 2007 May 22, 2010 Closed
86 Further Development and Applications of Highdimensional Quantum Mechanics with Coupled Coherent States. EPSRC
£1,467,000
May 23, 2007 May 23, 2010 Closed
87 Hyper Flux EPSRC
£383,960
Sept. 14, 2014 Sept. 13, 2016 Closed
88 Boiling in Microchannels: integrated design of closed-loop cooling system for devices operating at high heat fluxes EPSRC
£2,095,660
April 30, 2013 Oct. 30, 2016 Closed
89 IMT Physics-based and Data-driven Modelling of pollutant Emissions from Engines EPSRC
£0
June 30, 2021 Dec. 31, 2024 Active
90 Real World Optimisation with Life-Long Learning EPSRC
£476,136
Jan. 1, 2013 Dec. 31, 2015 Closed
91 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC
£273,928
Sept. 30, 2009 Sept. 30, 2010 Closed
92 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC
£184,926
Sept. 30, 2010 Sept. 29, 2012 Closed
93 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC
£210,364
Jan. 21, 2010 Jan. 20, 2013 Closed
94 Utilising cycle-accurate architectural simulation to aid in the design space exploration of future HPC hardware. EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
95 SERT: Scale-free, Energy-aware, Resilient and Transparent Adaptation of CSE Applications to Mega-core Systems EPSRC
£1,927,856
March 31, 2015 Sept. 29, 2018 Closed
96 SERT: Scale-free, Energy-aware, Resilient and Transparent Adaptation of CSE Applications to Mega-core Systems EPSRC
£4,819,640
March 31, 2015 Sept. 30, 2018 Closed
97 Computational Modelling of Defects in Battery Materials EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
98 Computational Modelling of Defects in Battery Materials EPSRC
£0
Sept. 30, 2017 Sept. 30, 2021 Closed
99 PyFR: Towards Industry and Exascale EPSRC
£2,161,814
Sept. 22, 2018 March 22, 2022 Closed
100 Real-time Virtual Prototypes for the Power Electronics Supply Chain EPSRC
£5,182,945
June 30, 2023 June 30, 2026 Active
Reset