1 |
Verification of performance of novel ultra-sonic flow meter through controllable, variable, real-world application |
Innovate UK |
£25,480 |
Jan. 1, 2022 |
March 30, 2022 |
Closed |
2 |
Verification of performance of novel ultra-sonic flow meter through controllable, variable, real-world application |
Innovate UK |
£63,700 |
Jan. 1, 2022 |
March 31, 2022 |
Closed |
3 |
Pioneer™ Mobile Hydrogen Refueller |
Innovate UK |
£128,450 |
Dec. 1, 2021 |
Jan. 31, 2022 |
Closed |
4 |
Pioneer Mobile Hydrogen Refueller |
Innovate UK |
£5,000,000 |
June 16, 2020 |
June 17, 2023 |
Closed |
5 |
Pioneer™ Mobile Hydrogen Refueller |
Innovate UK |
£321,125 |
Dec. 1, 2021 |
Jan. 31, 2022 |
Closed |
6 |
Online H2 Quality Service |
Innovate UK |
£3,852,432 |
March 1, 2021 |
April 29, 2022 |
Closed |
7 |
Integrated Refrigeration System for Gas Conditioning and Heat Manamgement in Hydrogen Refuelling Stations |
Innovate UK |
£200,000 |
Dec. 1, 2012 |
Nov. 30, 2013 |
Closed |
8 |
A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. |
Innovate UK |
£812,924 |
Aug. 31, 2022 |
Aug. 30, 2024 |
Active |
9 |
A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. |
Innovate UK |
£4,064,620 |
Aug. 31, 2022 |
Aug. 31, 2024 |
Active |
10 |
Safety strategies and engineering solutions for hydrogen heavy-duty vehicles |
EPSRC |
£0 |
Sept. 19, 2022 |
Sept. 18, 2026 |
Active |
11 |
Safety strategies and engineering solutions for hydrogen heavy-duty vehicles |
EPSRC |
£0 |
Sept. 19, 2022 |
Sept. 19, 2026 |
Active |
12 |
Online H2 Quality Service |
Innovate UK |
£119,876 |
Sept. 30, 2020 |
Dec. 31, 2020 |
Closed |
13 |
Zero Emission Hydrogen Demonstration in Airport applications (ZEHyDA) at RAF Leeming & Teesside International Airport |
Innovate UK |
£778,444 |
Aug. 31, 2021 |
March 30, 2022 |
Closed |
14 |
Novel Process for MEA Catalyst Fixing |
Innovate UK |
£99,814 |
March 1, 2017 |
Feb. 28, 2018 |
Closed |
15 |
Novel Process for MEA Catalyst Fixing |
Innovate UK |
£249,535 |
March 1, 2017 |
Feb. 28, 2018 |
Closed |
16 |
Water Analysis in Wet Gas Flows |
Innovate UK |
£59,485 |
March 1, 2023 |
Oct. 31, 2023 |
Active |
17 |
Development of techniques & methods for sampling, calibration and testing of hydrogen purity for fuel cell vehicles |
EPSRC |
£0 |
Sept. 30, 2020 |
Sept. 29, 2024 |
Active |
18 |
Reducing Flow Measurement Uncertainties Through Accurate Determination of Thermophysical Properties of H2 and CO2 rich Fluid Mixtures |
Innovate UK |
£251,890 |
July 31, 2023 |
Jan. 31, 2024 |
Active |
19 |
Enabling Electrolyser Manufacturing Capability |
Innovate UK |
£2,478,905 |
Jan. 1, 2016 |
Dec. 31, 2017 |
Closed |
20 |
Frankenstack |
ISCF |
£505,405 |
June 30, 2018 |
March 31, 2019 |
Closed |