Home Projects More like: Optimising power grids and chemical reactions with graph neural networks [Clear] # Title Funder Funding Start End Status 81 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 82 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 83 Digitalisation of Electrical Power and Energy Systems Operation (DEEPS) UKRI £1,490,121 July 31, 2022 July 30, 2026 Active 84 Digitalisation of Electrical Power and Energy Systems Operation (DEEPS) FLF £7,450,605 July 31, 2022 March 31, 2023 Closed 85 Digitalisation of Electrical Power and Energy Systems Operation (DEEPS) FLF £6,987,545 March 31, 2023 July 31, 2026 Active 86 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC £1,043,994 Aug. 31, 2008 Feb. 29, 2012 Closed 87 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC £2,609,985 Aug. 31, 2008 Feb. 29, 2012 Closed 88 Joint UK-India Clean Energy Centre (JUICE) EPSRC £10,188,872 Sept. 30, 2016 March 30, 2022 Closed 89 Joint UK-India Clean Energy Centre (JUICE) Newton Fund £25,472,180 Sept. 30, 2016 March 31, 2022 Closed 90 Structural optimisation of wind turbine components using topology optimisation Innovate UK £156,000 June 30, 2013 March 30, 2014 Closed 91 Exploring Applications of Additive Manufacturing for Flow Control, Heat Transfer and Mass Transfer EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 92 Combined Effects of Light Gas and Damage Accumulation in Beryllium EPSRC £1,534,855 Dec. 1, 2020 Dec. 5, 2023 Active 93 Fast Real-time Linearized State Estimation in Active Distribution Systems EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 94 Fast Real-time Linearized State Estimation in Active Distribution Systems EPSRC £0 Sept. 30, 2021 March 31, 2025 Active 95 Real-time Virtual Prototypes for the Power Electronics Supply Chain EPSRC £5,182,945 June 30, 2023 June 30, 2026 Active 96 The applicability of grey-box performance-based modelling techniques in existing office buildings in the UK EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 97 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC £483,202 Aug. 31, 2014 Aug. 30, 2017 Closed 98 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC £1,208,005 Aug. 31, 2014 Aug. 31, 2017 Closed 99 GENSSIS (Gravitational Energy Storage & Synchronous Inertial Stability) Phase 2 Innovate UK £1,440,546 June 30, 2018 March 31, 2019 Closed 100 GENSSIS (Gravitational Energy Storage & Synchronous Inertial Stability) Phase 2 ISCF £3,601,365 June 30, 2018 March 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »