Home Projects More like: PyroPower Africa Stage 2 [Clear] # Title Funder Funding Start End Status 1 PyroPower Africa Stage 2 Innovate UK £13,448,740 Aug. 31, 2022 Aug. 31, 2025 Active 2 Nigeria Energy Market Entry Study (NEMES) Innovate UK £41,914 Jan. 1, 2022 March 30, 2022 Closed 3 Nigeria Energy Market Entry Study (NEMES) Innovate UK £104,785 Jan. 1, 2022 March 31, 2022 Closed 4 Mobile Power’s combined ‘battery-as-a-service’ and ‘vehicle-as-a-service’ business model pilot in rural Nigeria Innovate UK £2,517,795 Aug. 31, 2022 Aug. 30, 2025 Active 5 Mobile Power’s combined ‘battery-as-a-service’ and ‘vehicle-as-a-service’ business model pilot in rural Nigeria Innovate UK £12,588,975 Aug. 31, 2022 Aug. 31, 2025 Active 6 Rice-straw powered biowaste to energy Innovate UK £5,602,160 March 31, 2023 March 31, 2025 Active 7 A Self-contained Solar-Hydro Micro Power Plant for Uninterrupted Supply in all Weather Conditions Innovate UK £494,430 March 31, 2020 July 30, 2021 Closed 8 A Self-contained Solar-Hydro Micro Power Plant for Uninterrupted Supply in all Weather Conditions Innovate UK £1,236,075 March 31, 2020 July 31, 2021 Closed 9 A sustainable route to high value terpenoid production in cyanobacteria BBSRC £0 Sept. 30, 2018 Dec. 30, 2022 Active 10 A sustainable route to high value terpenoid production in cyanobacteria BBSRC £0 Sept. 30, 2018 March 31, 2023 Closed 11 Upscaling LiFePO4 battery production for Bolivia Innovate UK £509,982 March 31, 2020 Sept. 29, 2021 Closed 12 Upscaling LiFePO4 battery production for Bolivia Innovate UK £1,274,955 March 31, 2020 Sept. 30, 2021 Closed 13 ECOSMART: Enabling local Circular ecOnomy hubs using SMart solar AnaeRobic Digestion Technology Innovate UK £509,938 March 1, 2020 May 30, 2021 Closed 14 ECOSMART: Enabling local Circular ecOnomy hubs using SMart solar AnaeRobic Digestion Technology Innovate UK £1,274,845 March 1, 2020 May 31, 2021 Closed 15 ECOSMART:2 Innovate UK £1,184,959 Aug. 31, 2022 Aug. 30, 2024 Active 16 ECOSMART:2 Innovate UK £5,924,795 Aug. 31, 2022 Aug. 31, 2024 Active 17 Developing the specification of dried spent coffee grounds as a sustainable material for use in a range of industries Innovate UK £298,822 Sept. 30, 2020 June 29, 2021 Closed 18 Developing the specification of dried spent coffee grounds as a sustainable material for use in a range of industries Innovate UK £747,055 Sept. 30, 2020 June 30, 2021 Closed 19 Ghana GOALs - Generation, Operation, and Access to Energy, at Lowest carbon and cost solutions Innovate UK £2,773,280 March 31, 2023 March 31, 2025 Active 20 Wide-Area Instrumentation of Power Networks using Existing Infrastructure Innovate UK £1,300,616 June 30, 2016 June 29, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »