Home Projects More like: Cell factory of the future - scaling up culture of cells on bioemulsions [Clear] # Title Funder Funding Start End Status 81 Hydrothermal Upgrading of Biomass/Lignin EPSRC £0 Nov. 1, 2018 July 31, 2022 Closed 82 Understanding biopolymer clusters formation in microalgae systems for wastewater: application to membrane photo-bioreactors EPSRC £201,550 May 31, 2018 Dec. 31, 2019 Closed 83 Understanding biopolymer clusters formation in microalgae systems for wastewater: application to membrane photo-bioreactors EPSRC £503,875 May 31, 2018 Dec. 31, 2019 Closed 84 EPSRC-SFI:Tailored Production and Utilisation of Sustainable Low Cost Lignocellulosic Advanced Biofuel Blends as Diesel and Petrol Substitutes:SusLABB EPSRC £2,194,792 Jan. 1, 2021 Dec. 31, 2024 Active 85 EPSRC-SFI:Tailored Production and Utilisation of Sustainable Low Cost Lignocellulosic Advanced Biofuel Blends as Diesel and Petrol Substitutes:SusLABB EPSRC £5,486,980 Jan. 1, 2021 Dec. 31, 2024 Active 86 Artificial Intelligence Enabling Future Optimal Flexible Biogas Production for Net-Zero EPSRC £7,182,615 April 30, 2023 March 31, 2025 Active 87 Pump priming towards the International Nitrogen Management System (INMSpp) NERC £336,464 June 14, 2014 July 30, 2017 Closed 88 Integrated Nitrogen Management System (Pump priming) NERC £310,454 March 31, 2014 July 30, 2017 Closed 89 Integrated Nitrogen Management System (Pump priming) NERC £776,135 March 31, 2014 July 31, 2017 Closed 90 Skippy Scout Soil: Drone-based soil sampling system Innovate UK £290,684 Jan. 1, 2022 March 30, 2023 Active 91 Microbial carbon cycling under geological CO2 storage conditions: understanding the rules of life in the engineered subsurface BBSRC £1,934,810 Jan. 1, 2022 Dec. 31, 2026 Active 92 Microbial carbon cycling under geological CO2 storage conditions: understanding the rules of life in the engineered subsurface BBSRC £4,837,025 Jan. 1, 2022 Dec. 31, 2026 Active 93 Using oscillatory flow and non-Newtonian media to enhance industrial processing of microalgae and other microswimmers EPSRC £0 Sept. 30, 2017 June 29, 2021 Closed 94 Using oscillatory flow and non-Newtonian media to enhance industrial processing of microalgae and other microswimmers EPSRC £0 Sept. 30, 2017 June 30, 2021 Closed 95 Osmotic Membrane Technologies for Energy Neutral Wastewater Treatment: Process Performance and Optimization EPSRC £197,150 June 30, 2016 May 30, 2018 Closed 96 Osmotic Membrane Technologies for Energy Neutral Wastewater Treatment: Process Performance and Optimization EPSRC £492,875 June 30, 2016 May 31, 2018 Closed 97 MacroBioCrude: Developing an Integrated Supply and Processing Pipeline for the Sustained Production of Ensiled Macroalgae-derived Hydrocarbon Fuels EPSRC £633,890 Feb. 1, 2013 Jan. 31, 2018 Closed 98 MacroBioCrude: Developing an Integrated Supply and Processing Pipeline for the Sustained Production of Ensiled Macroalgae-derived Hydrocarbon Fuels EPSRC £334,942 July 15, 2013 July 14, 2018 Closed 99 MacroBioCrude: Developing an Integrated Supply and Processing Pipeline for the Sustained Production of Ensiled Macroalgae-derived Hydrocarbon Fuels EPSRC £232,106 Feb. 1, 2013 Sept. 29, 2018 Closed 100 MacroBioCrude: Developing an Integrated Supply and Processing Pipeline for the Sustained Production of Ensiled Macroalgae-derived Hydrocarbon Fuels EPSRC £325,086 Feb. 1, 2013 Sept. 29, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »