Home Projects More like: Edible Microcarriers for Cultivated Meat Produced from Organic Waste Material [Clear] # Title Funder Funding Start End Status 21 BBSRC Centre For Sustainable Bioenergy (BSBEC): Programme 4: Lignocellulosic Conversion To Bioethanol (LACE) BBSRC £10,698,900 April 30, 2009 March 30, 2015 Closed 22 BBSRC Centre For Sustainable Bioenergy (BSBEC): Programme 4: Lignocellulosic Conversion To Bioethanol (LACE) BBSRC £26,747,250 April 30, 2009 March 31, 2015 Closed 23 Exploiting plant cell diversity to understand and improve plant cell wall composition BBSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 24 Exploiting plant cell diversity to understand and improve plant cell wall composition BBSRC £0 Sept. 30, 2019 March 31, 2024 Active 25 Using flow cytometry and genomics to characterise and optimise microalgal-bacterial consortia cultivated on Wastewater to produce biomass for Biofuel BBSRC £1,402,642 Sept. 30, 2013 Sept. 17, 2014 Closed 26 Using flow cytometry and genomics to characterise and optimise microalgal-bacterial consortia cultivated on Wastewater to produce biomass for Biofuel BBSRC £1,060,108 March 24, 2015 April 29, 2017 Closed 27 Using flow cytometry and genomics to characterise and optimise microalgal-bacterial consortia cultivated on Wastewater to produce biomass for Biofuel BBSRC £3,506,605 Sept. 30, 2013 Sept. 18, 2014 Closed 28 Using flow cytometry and genomics to characterise and optimise microalgal-bacterial consortia cultivated on Wastewater to produce biomass for Biofuel BBSRC £2,650,270 Sept. 18, 2014 March 23, 2015 Closed 29 Using flow cytometry and genomics to characterise and optimise microalgal-bacterial consortia cultivated on Wastewater to produce biomass for Biofuel BBSRC £2,650,270 March 24, 2015 April 30, 2017 Closed 30 Identification of Genetic Traits for Capacity to Digest Non-Standard Feed Materials in Meat Poultry BBSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 31 Photocatalytic bioethanol Production EPSRC £2,306,266 June 30, 2013 June 29, 2017 Closed 32 Photocatalytic bioethanol Production EPSRC £5,765,665 June 30, 2013 June 30, 2017 Closed 33 Assessment of Integrated Microalgal-Bacterial Ecosystems for Bioenergy Production - Optimization-based Methodology EPSRC £198,762 Feb. 1, 2012 Jan. 31, 2013 Closed 34 Assessment of Integrated Microalgal-Bacterial Ecosystems for Bioenergy Production - Optimization-based Methodology EPSRC £496,905 Feb. 1, 2012 Jan. 31, 2013 Closed 35 The role of CESA protein modification in localisation and function of the cellulose synthase complex BBSRC £855,736 Nov. 1, 2010 April 29, 2014 Closed 36 Green, Circular, and Smart Cement Manufacture UKRI £3,408,196 Nov. 1, 2021 Oct. 31, 2025 Active 37 CALIBER: Conductive Additives to reduce Lithium Ion Battery Electrode Resistance Innovate UK £258,154 March 31, 2021 March 30, 2022 Closed 38 CESBIC--Critical Enzymes for Sustainable Biofuels from Cellulose BBSRC £1,449,186 March 31, 2013 June 30, 2016 Closed 39 CESBIC--Critical Enzymes for Sustainable Biofuels from Cellulose BBSRC £3,668,195 March 31, 2013 July 1, 2016 Closed 40 Textile waste refinery for the production of recycled plastic, cellulose and dye EPSRC £7,315,705 Sept. 30, 2023 Sept. 30, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »