Home Projects More like: Using novel biotechnology process to scale zero-carbon concrete and create a BioConcrete block product [Clear] # Title Funder Funding Start End Status 41 Continuous Solid-state Smart Microwave-based System for Manufacturing Low-carbon Concretes Innovate UK £1,198,262 March 31, 2013 Sept. 29, 2016 Closed 42 Re-usable net-zero carbon structures ISCF £981,485 June 30, 2020 Dec. 31, 2021 Closed 43 Cloud Cycle & HS2: Transforming Cement & its Supply Chain with IoT, Machine Learning & Big Data. Innovate UK £1,169,338 March 31, 2021 March 30, 2022 Closed 44 Disproportionate collapse resistance of CLT buildings EPSRC £0 Sept. 19, 2021 March 30, 2028 Active 45 Development of bio-based, low carbon and low cost building materials with improved thermal and acoustic properties NERC £0 Dec. 1, 2018 Sept. 29, 2022 Active 46 Novel Additives to Enhance the Performance of Low Carbon Cements for a Net Zero Future EPSRC £0 Sept. 25, 2022 March 25, 2026 Active 47 Structural performance of slab-column connenctions under impact and blast loading EPSRC £498,210 Feb. 4, 2013 Aug. 4, 2014 Closed 48 Porcement. Recylcing Tiles into a concete alternative. Innovate UK £592,125 July 31, 2023 July 31, 2024 Active 49 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC £249,904 Nov. 1, 2010 Feb. 21, 2014 Closed 50 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC £276,912 Oct. 14, 2010 Jan. 31, 2014 Closed 51 Earthern construction as a tailored alternative to conventional carbon-intensive materials in construction EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 52 Climate-change effects on the performance of bioengineered clay fill embankments EPSRC £199,284 Nov. 7, 2016 May 5, 2018 Closed 53 SOIL STABILISATION USING INTEGRATED DESIGN OF LOW CO2 ALTERNATIVE CEMENTITIOUS BINDERS Innovate UK £95,700 Feb. 1, 2022 July 30, 2022 Closed 54 Natural Structural Materials: Super Tall Timber EPSRC £493,174 Sept. 27, 2015 Sept. 26, 2017 Closed 55 G8-2012 Structural Bamboo Products EPSRC £845,504 Feb. 1, 2013 Jan. 31, 2016 Closed 56 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £449,858 Aug. 31, 2011 Sept. 29, 2012 Closed 57 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £1,124,645 Aug. 31, 2011 Sept. 30, 2012 Closed 58 Life Cycle Assessment of Sustainable Cement EPSRC £0 Nov. 1, 2021 April 29, 2025 Active 59 CMMI-EPSRC RENACEM: Response to CO2 exposure of concrete with natural supplementary cementitious materials EPSRC £899,286 Jan. 1, 2020 June 29, 2023 Active 60 CMMI-EPSRC RENACEM: Response to CO2 exposure of concrete with natural supplementary cementitious materials EPSRC £2,248,215 Jan. 1, 2020 June 30, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »