# Title Funder Funding Start End Status
21 2-D materials as the next generation membranes in hydrogen generation and low temperature fuel cells. EPSRC
£979,312
March 1, 2016 Feb. 29, 2020 Closed
22 2-D materials as the next generation membranes in hydrogen generation and low temperature fuel cells. EPSRC
£2,448,280
March 1, 2016 Feb. 29, 2020 Closed
23 Ionic Liquid Electrolytes for Intermediate Temperature Electrolysers EPSRC
£582,478
Dec. 1, 2016 Nov. 30, 2019 Closed
24 Ionic Liquid Electrolytes for Intermediate-Temperature Electrolysers EPSRC
£892,520
Dec. 1, 2016 Nov. 30, 2019 Closed
25 Anion exchange membrane water electrolysis for low-cost green hydrogen production (AEM-H2) EPSRC
£249,433
Aug. 31, 2022 Aug. 30, 2023 Active
26 Enabling Electrolyser Manufacturing Capability Innovate UK
£2,478,905
Jan. 1, 2016 Dec. 31, 2017 Closed
27 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC
£0
Sept. 30, 2021 March 30, 2025 Active
28 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC
£0
Sept. 30, 2021 March 31, 2025 Active
29 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£252,097
July 24, 2022 Jan. 24, 2024 Active
30 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£1,260,485
July 24, 2022 Jan. 24, 2024 Active
31 Supported MoTe2: proving the viability of a 2D material to be employed in the PEM flow cell for the hydrogen production EPSRC
£246,774
Sept. 30, 2022 March 31, 2024 Active
32 Supported MoTe2: proving the viability of a 2D material to be employed in the PEM flow cell for the hydrogen production EPSRC
£1,233,870
Sept. 30, 2022 March 31, 2024 Active
33 LOCATE: LOw Cost cATalysts for water Electrolysers Innovate UK
£713,498
Sept. 30, 2014 April 29, 2016 Closed
34 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£217,826
Nov. 1, 2022 April 29, 2024 Active
35 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£1,089,130
Nov. 1, 2022 April 30, 2024 Active
36 Integrating a mixed energy vector battolyser into a microgrid NERC
£12,770
Aug. 31, 2022 Aug. 30, 2023 Active
37 Integrating a mixed energy vector battolyser into a microgrid NERC
£63,850
Aug. 31, 2022 Aug. 31, 2023 Closed
38 AHEAD (Affordable Hydrogen from Electrolysis Accelerating Decarbonisation) Innovate UK
£644,788
May 31, 2021 Nov. 30, 2022 Active
39 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£706,292
Dec. 8, 2014 Dec. 7, 2017 Closed
40 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£602,472
Dec. 31, 2014 June 29, 2018 Closed
Reset