# Title Funder Funding Start End Status
1 Regenerative 3D printed cementitious skins for building components (Re3DSkin) EPSRC
£246,904
Aug. 31, 2022 Aug. 30, 2024 Active
2 Low carbon damage resistance concrete for roads EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
3 Low carbon geopolymer (pre-cast concrete) Innovate UK
£48,552
July 31, 2015 Nov. 30, 2015 Closed
4 New Industrial Systems: Manufacturing Immortality EPSRC
£4,413,802
March 1, 2018 Nov. 30, 2021 Closed
5 Increasing the early age strength of High Volume Fly Ash (HVFA) concrete EPSRC
£195,514
Sept. 9, 2012 March 9, 2015 Closed
6 REcovey and use of Cement kIlN Dust as the alkali activator for geopolymeric (cementless) concrete building blocks (RESCIND) Innovate UK
£499,128
Nov. 1, 2015 April 29, 2018 Closed
7 Recycling of FRP wind blade waste material in concrete EPSRC
£0
Sept. 27, 2020 Jan. 31, 2025 Active
8 Recycling of FRP wind blade waste material in concrete EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
9 Understanding intermediate temperature fatigue crack growth in single crystal Ni-based superalloys EPSRC
£0
Sept. 29, 2021 Sept. 29, 2025 Active
10 Graphene Enhanced Concrete for a Resilient Recovery Innovate UK
£757,242
March 31, 2021 March 30, 2022 Closed
11 SOIL STABILISATION USING INTEGRATED DESIGN OF LOW CO2 ALTERNATIVE CEMENTITIOUS BINDERS Innovate UK
£95,700
Feb. 1, 2022 July 30, 2022 Closed
12 CABLEHEAL Innovate UK
£525,510
April 30, 2016 Jan. 31, 2019 Closed
13 Novel Additives to Enhance the Performance of Low Carbon Cements for a Net Zero Future EPSRC
£0
Sept. 25, 2022 March 25, 2026 Active
14 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£449,858
Aug. 31, 2011 Sept. 29, 2012 Closed
15 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£1,124,645
Aug. 31, 2011 Sept. 30, 2012 Closed
16 Engineered UK clays for production of low-carbon cements EPSRC
£165,356
June 30, 2022 June 29, 2026 Active
17 Engineered UK clays for production of low-carbon cements EPSRC
£997,934
June 30, 2022 June 29, 2026 Active
18 Engineered UK clays for production of low-carbon cements EPSRC
£857,130
June 30, 2022 June 29, 2026 Active
19 Low Carbon Concrete Manufacturing Process Innovate UK
£333,204
March 1, 2021 Dec. 31, 2021 Closed
20 Design and Manufacture of furan-based self-healing materials EPSRC, NERC
£0
Sept. 30, 2017 June 30, 2022 Closed