1 Development of Refractory Coatings to support the Decarbonisation of the Steelmaking Process EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
2 Continuous Measurement of Liquid Steel Temperature and Chemistry EPSRC
£0
Jan. 1, 2022 Dec. 31, 2025 Active
3 Continuous Measurement of Liquid Steel Temperature and Chemistry EPSRC
£0
Jan. 1, 2022 Dec. 31, 2025 Active
4 New Generation Low Carbon Refractory Composites Based on Graphite-Exfoliation EPSRC
£1,234,866
Aug. 31, 2012 Feb. 29, 2016 Closed
5 Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing EPSRC
£2,320,158
March 31, 2016 March 30, 2022 Closed
6 H2-Heat: Thermal energy transport for heating and cooling with innovative hydrogen(H2) technologies EPSRC
£1,990,480
Jan. 1, 2021 Dec. 31, 2023 Active
7 H2-Heat: Thermal energy transport for heating and cooling with innovative hydrogen(H2) technologies EPSRC
£4,976,200
Jan. 1, 2021 Dec. 31, 2024 Active
8 Engineering sustainable routes to carbon capture and reusage: Conversion of CO2 from steelworks to coating products. EPSRC
£0
Sept. 30, 2019 Dec. 30, 2023 Active
9 Engineering sustainable routes to carbon capture and reusage: Conversion of CO2 from steelworks to coating products. EPSRC
£0
Sept. 30, 2019 Dec. 30, 2023 Active
10 Transitioning to High Scrap steel Manufacturing EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
11 Steps towards sustainability and decarbonisation - impact of high recycled content and advanced casting on high formability products EPSRC
£0
Jan. 1, 2022 Dec. 31, 2025 Active
12 Development of formable automotive steel grades through alternative steel making technologies EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
13 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC
£7,051,488
March 31, 2014 Sept. 13, 2024 Active
14 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC
£17,639,430
March 31, 2014 Sept. 14, 2024 Active
15 Defect-engineered metal-organic frameworks for carbon dioxide capture EPSRC
£194,084
April 30, 2018 Jan. 31, 2020 Closed
16 Defect-engineered metal-organic frameworks for carbon dioxide capture EPSRC
£485,210
April 30, 2018 Jan. 31, 2020 Closed
17 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC
£1,279,344
Sept. 30, 2009 March 31, 2013 Closed
18 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC
£3,198,360
Sept. 30, 2009 March 31, 2013 Closed
19 ASSURE - Advanced Steel Shaping Using Reduced Energy EPSRC
£383,726
Jan. 1, 2015 Oct. 31, 2016 Closed
20 ASSURE - Advanced Steel Shaping Using Reduced Energy EPSRC
£959,315
Jan. 1, 2015 Oct. 31, 2016 Closed