# Title Funder Funding Start End Status
1 Developing a new, global standard for delivering in-car entertainment in Partial Hybrid and Zero and Low Emission Electric Vehicles (PHEVs & ZLEVs) Innovate UK
£1,861,230
June 30, 2020 Sept. 30, 2021 Closed
2 Substitution and Sustainability in Functional Materials and Devices EPSRC
£4,932,736
June 30, 2014 Dec. 30, 2019 Closed
3 Substitution and Sustainability in Functional Materials and Devices EPSRC
£12,331,840
June 30, 2014 Dec. 30, 2019 Closed
4 Prototype of a power train for hydrogen vessels Innovate UK
£1,948,741
Jan. 1, 2023 Nov. 30, 2023 Closed
5 Field Enhanced Sintering of Beta Alumina for Electric Vehicle Battery Applications ISCF
£763,930
April 30, 2018 March 31, 2019 Closed
6 Efficient, Sustainable Transportation using a Hydrogen Electochemical Reaction Innovate UK
£18,106,070
Nov. 1, 2019 Oct. 31, 2023 Active
7 AC charging with EV metadata and State-of-Charge (ACES): for truly smart charging and V2G Innovate UK
£160,118
Sept. 30, 2020 March 30, 2021 Closed
8 AC charging with EV metadata and State-of-Charge (ACES): for truly smart charging and V2G Innovate UK
£400,295
Sept. 30, 2020 March 31, 2021 Closed
9 Advancement of Castings in the Nuclear Supply Chain EPSRC
£899,810
June 30, 2013 June 30, 2015 Closed
10 (H)olistic (A)pproach to the Design of Efficient Heat (R)ecovery Systems for Electrical (P)ower (P)roduction (HARP^2) EPSRC
£760,860
April 30, 2018 Oct. 31, 2022 Active
11 (H)olistic (A)pproach to the Design of Efficient Heat (R)ecovery Systems for Electrical (P)ower (P)roduction (HARP^2) EPSRC
£811,614
April 30, 2018 Feb. 28, 2022 Closed
12 (H)olistic (A)pproach to the Design of Efficient Heat (R)ecovery Systems for Electrical (P)ower (P)roduction (HARP^2) EPSRC
£366,330
April 30, 2018 Oct. 31, 2022 Active
13 (H)olistic (A)pproach to the Design of Efficient Heat (R)ecovery Systems for Electrical (P)ower (P)roduction (HARP^2) EPSRC
£2,029,035
April 30, 2018 Feb. 28, 2022 Closed
14 Future scale-Up comprEssor Line highLy Efficient Drive (Project FUELLED) Innovate UK
£839,158
July 31, 2022 Oct. 31, 2023 Active
15 Electric Drive-system Innovate UK
£576,094
March 31, 2020 June 29, 2021 Closed
16 Building New Capability in Structural Ceramics EPSRC
£10,869,070
June 30, 2008 June 29, 2013 Closed
17 Development of a small tokamak with high temperature superconducting magnets for sale as a fusion research instrument Innovate UK
£1,250,000
July 31, 2012 March 31, 2014 Closed
18 Final Development of a Zero Energy Dehumidification and Cooling System EPSRC
£414,170
March 31, 2017 March 31, 2019 Closed
19 Hydrogen Fuel Cell Range Extender Innovate UK
£10,003,055
Jan. 1, 2023 Nov. 30, 2023 Active
20 Graphitization of Carbon for Anodes Innovate UK
£122,844
Sept. 30, 2020 March 30, 2021 Closed
Reset