Home Projects More like: Improved hydrogen-steam electrodes for solid oxide electrolysers [Clear] # Title Funder Funding Start End Status 1 Collaborative Research in Energy with South Africa. Intermediate Temperature Proton Conducting Membrane Systems for the Hydrogen Economy EPSRC £692,174 April 5, 2010 Oct. 4, 2013 Closed 2 Collaborative Research in Energy with South Africa. Intermediate Temperature Proton Conducting Membrane Systems for the Hydrogen Economy EPSRC £1,730,435 April 5, 2010 Oct. 5, 2013 Closed 3 CHROME – Clean Hydrogen Manufacture Innovate UK £364,527 June 30, 2022 June 29, 2023 Active 4 CHROME – Clean Hydrogen Manufacture Innovate UK £1,822,635 June 30, 2022 June 30, 2023 Closed 5 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC £252,097 July 24, 2022 Jan. 24, 2024 Active 6 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC £1,260,485 July 24, 2022 Jan. 24, 2024 Active 7 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £240,882 Oct. 16, 2022 Oct. 15, 2023 Active 8 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £1,204,410 Oct. 16, 2022 Nov. 16, 2023 Closed 9 Ionic Liquid Electrolytes for Intermediate Temperature Electrolysers EPSRC £582,478 Dec. 1, 2016 Nov. 30, 2019 Closed 10 Ionic Liquid Electrolytes for Intermediate-Temperature Electrolysers EPSRC £892,520 Dec. 1, 2016 Nov. 30, 2019 Closed 11 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £706,292 Dec. 8, 2014 Dec. 7, 2017 Closed 12 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £602,472 Dec. 31, 2014 June 29, 2018 Closed 13 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £162,381 Sept. 30, 2022 March 31, 2024 Active 14 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £88,585 May 31, 2022 Nov. 30, 2023 Active 15 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £811,905 Sept. 30, 2022 March 31, 2024 Active 16 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £553,774 Jan. 10, 2022 Jan. 9, 2025 Active 17 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £1,446,210 Jan. 10, 2022 Jan. 9, 2025 Active 18 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £578,834 Sept. 30, 2021 Jan. 9, 2025 Active 19 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £576,608 Sept. 30, 2021 March 30, 2025 Active 20 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £3,615,525 Jan. 10, 2022 Jan. 9, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »