Home Projects More like: Development and application of lattice Boltzmann models for predictive large eddy simulation of turbomachinery aerodynamics [Clear] # Title Funder Funding Start End Status 41 CBET-EPSRC: Hybrid organic-CMOS devices for optogenetic simulation and lens-free fluorescence imaging of the brain EPSRC £767,072 Aug. 31, 2017 Nov. 16, 2020 Closed 42 TRAffic Modelling for Sensor Network Optimisation and Development (TRAMSNOD) EPSRC £363,474 Jan. 1, 2007 May 30, 2010 Closed 43 TRAffic Modelling for Sensor Network Optimisation and Development (TRAMSNOD) EPSRC £149,878 March 31, 2007 March 30, 2010 Closed 44 TRAffic Modelling for Sensor Network Optimisation and Development (TRAMSNOD) EPSRC £374,695 March 31, 2007 March 31, 2010 Closed 45 TRAffic Modelling for Sensor Network Optimisation and Development (TRAMSNOD) EPSRC £908,685 Jan. 1, 2007 May 31, 2010 Closed 46 Scaling limits of random particle aggregation models EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 47 Commercialisation of Shape Morphing and Optimisation Technology for Fluid-Dynamic Applications EPSRC £247,756 Sept. 30, 2008 Sept. 29, 2009 Closed 48 A combined experimental and numerical investigation of premixed flame-wall interaction in turbulent boundary layers EPSRC £1,553,790 May 23, 2021 May 22, 2025 Active 49 A combined experimental and numerical investigation of premixed flame-wall interaction in turbulent boundary layers EPSRC £1,285,402 April 5, 2021 April 4, 2025 Active 50 Automorph: Bringing Rigor to the Creation of Morphing Interactive Devices EPSRC £268,020 Nov. 1, 2016 March 18, 2019 Closed 51 Selection and Optimization of Radiation Detector Materials EPSRC £481,850 Feb. 1, 2007 Jan. 31, 2010 Closed 52 Wave Hub baseline study NERC £240,735 July 31, 2010 July 31, 2012 Closed 53 Energy management decisions under real-time uncertainty in both price and load EPSRC £289,578 Sept. 12, 2007 March 12, 2009 Closed 54 Energy management decisions under real-time uncertainty in both price and load EPSRC £723,945 Sept. 12, 2007 March 12, 2009 Closed 55 Design of novel, additively manufactured cellular lattice supported composite structures using topology optimisation EPSRC £0 Sept. 30, 2019 Jan. 31, 2024 Active 56 The Use of Probabilistic Climate Data to Future-Proof Design Decisions in the Buildings Sector EPSRC £1,032,086 June 30, 2008 June 29, 2011 Closed 57 The Use of Probabilistic Climate Data to Future-Proof Design Decisions in the Buildings Sector EPSRC £2,580,215 June 30, 2008 June 30, 2011 Closed 58 Firedrake: high performance, high productivity simulation for the continuum mechanics community. EPSRC £688,848 Sept. 30, 2022 Sept. 29, 2025 Active 59 Scaling overall metal effectiveness from ECAT rig to engine conditions EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 60 Ebbs and flows of Energy System (EFES) Innovate UK £192,975 July 31, 2013 Oct. 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »