# Title Funder Funding Start End Status
1 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC
£1,204,410
Oct. 16, 2022 Nov. 16, 2023 Closed
2 Improved hydrogen-steam electrodes for solid oxide electrolysers EPSRC
£227,505
Dec. 1, 2022 May 30, 2024 Active
3 Collaborative Research in Energy with South Africa. Intermediate Temperature Proton Conducting Membrane Systems for the Hydrogen Economy EPSRC
£692,174
April 5, 2010 Oct. 4, 2013 Closed
4 Collaborative Research in Energy with South Africa. Intermediate Temperature Proton Conducting Membrane Systems for the Hydrogen Economy EPSRC
£1,730,435
April 5, 2010 Oct. 5, 2013 Closed
5 Ionic Liquid Electrolytes for Intermediate Temperature Electrolysers EPSRC
£582,478
Dec. 1, 2016 Nov. 30, 2019 Closed
6 Ionic Liquid Electrolytes for Intermediate-Temperature Electrolysers EPSRC
£892,520
Dec. 1, 2016 Nov. 30, 2019 Closed
7 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£252,097
July 24, 2022 Jan. 24, 2024 Active
8 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£1,260,485
July 24, 2022 Jan. 24, 2024 Active
9 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£706,292
Dec. 8, 2014 Dec. 7, 2017 Closed
10 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£602,472
Dec. 31, 2014 June 29, 2018 Closed
11 The Catrode Project - new Catalysts for Green Hydrogen production at industrial scale Innovate UK
£293,459
Sept. 30, 2022 Jan. 31, 2024 Active
12 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC
£0
Sept. 30, 2021 March 30, 2025 Active
13 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC
£0
Sept. 30, 2021 March 31, 2025 Active
14 Efficient low carbon energy storage and conversion on exsolved interfaces EPSRC
£1,044,508
June 24, 2018 July 25, 2022 Closed
15 CHROME – Clean Hydrogen Manufacture Innovate UK
£364,527
June 30, 2022 June 29, 2023 Active
16 CHROME – Clean Hydrogen Manufacture Innovate UK
£1,822,635
June 30, 2022 June 30, 2023 Closed
17 Materials For High Temperature Fuel Cell Technology EPSRC
£2,015,874
Jan. 1, 2008 Dec. 31, 2012 Closed
18 Materials For High Temperature Fuel Cell Technology EPSRC
£5,039,685
Jan. 1, 2008 Dec. 31, 2012 Closed
19 Clean hydrogen production by non-membrane electrolysis Innovate UK
£677,162
March 1, 2020 Aug. 30, 2021 Closed
20 Analysis of Catrode process for mass production of catalysts Innovate UK
£16,140
Jan. 1, 2023 March 30, 2023 Active
Reset