Home Projects More like: Water wave metamaterials in the design of ocean wave energy converters [Clear] # Title Funder Funding Start End Status 1 Water wave metamaterials in the design of ocean wave energy converters EPSRC £1,008,195 June 30, 2021 June 30, 2023 Closed 2 Modelling Extreme Free-Surface Flows: applications to breaking waves, wave-structure and wave-vessel interactions EPSRC £741,716 July 8, 2008 April 7, 2012 Closed 3 Modelling Extreme Free-Surface Flows: applications to breaking waves, wave-structure and wave-vessel interactions EPSRC £1,854,290 July 8, 2008 April 8, 2012 Closed 4 Short Term Deterministic Wave Prediction as a Tool for Enhanced Performance with Survivability for Wave Energy Converters. EPSRC £831,320 Sept. 30, 2007 March 31, 2009 Closed 5 Partnership for Public Engagement: Facts about Wave and Tidal Energy EPSRC £39,994 Sept. 30, 2010 June 29, 2011 Closed 6 Partnership for Public Engagement: Facts about Wave and Tidal Energy EPSRC £99,985 Sept. 30, 2010 June 30, 2011 Closed 7 THE HYDRODYNAMICS OF A DISTENSIBLE WAVE ENERGY CONVERTER EPSRC £860,344 Nov. 1, 2008 Feb. 28, 2011 Closed 8 THE HYDRODYNAMICS OF A DISTENSIBLE WAVE ENERGY CONVERTER EPSRC £2,150,860 Nov. 1, 2008 Feb. 28, 2011 Closed 9 Design of Wave and Current Generators for Stable Wave Generation in Multidirectional Combined Wave Current tanks EPSRC £4,951,460 July 31, 2010 Jan. 31, 2014 Closed 10 Wave Energy Converter for small communities EPSRC £197,264 Oct. 2, 2016 Oct. 1, 2017 Closed 11 Wave Energy Converter for small communities EPSRC £493,160 Oct. 2, 2016 Oct. 2, 2017 Closed 12 Feasibility Study for a Wave Energy Pilot Project in Indonesia Innovate UK £775,395 March 1, 2023 Feb. 29, 2024 Active 13 Market Size assessment for HF radar wave measurement systems NERC £18,636 Sept. 1, 2009 Jan. 1, 2010 Closed 14 Market Size assessment for HF radar wave measurement systems NERC £46,590 Sept. 1, 2009 Jan. 1, 2010 Closed 15 Wave Hub baseline study NERC £240,735 July 31, 2010 July 31, 2012 Closed 16 Wave Energy Converter - Cost Effective Reliability Innovate UK £616,640 Aug. 31, 2022 Feb. 29, 2024 Active 17 The hydrodynamics of deformable flexible fabric structures for wave energy conversion EPSRC £867,128 April 30, 2013 April 29, 2016 Closed 18 The hydrodynamics of deformable flexible fabric structures for wave energy conversion EPSRC £2,167,820 April 30, 2013 April 30, 2016 Closed 19 TeraWatt: Large scale Interactive coupled 3D modelling for wave and tidal energy resource and environmental impact (Remit 1 MASTS Consortium Proposal) EPSRC £1,963,886 May 31, 2012 Nov. 30, 2015 Closed 20 TeraWatt: Large scale Interactive coupled 3D modelling for wave and tidal energy resource and environmental impact (Remit 1 MASTS Consortium Proposal) EPSRC £4,909,715 May 31, 2012 Nov. 30, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »