Home Projects More like: PaMIr capital equipment [Clear] # Title Funder Funding Start End Status 1 PaMIr capital equipment STFC £335,185 Feb. 1, 2020 Dec. 31, 2021 Closed 2 Direct Fibre Optic Shape Sensing for Large Scale Engineering Structures EPSRC £4,136,298 Sept. 30, 2021 Sept. 29, 2025 Active 3 Primary AC Voltage Standard Calibration of Audio Source Innovate UK £24,674 Feb. 1, 2019 April 29, 2019 Closed 4 Nanoelectrospray as a direct writing method for electronic circuits EPSRC £310,296 July 1, 2007 June 30, 2009 Closed 5 Next generation optical coatings to fully open the window on the gravitational Universe STFC £584,565 July 31, 2022 July 30, 2027 Active 6 Next generation optical coatings to fully open the window on the gravitational Universe STFC £2,922,825 July 31, 2022 July 31, 2027 Active 7 Accurate Time and radio signal distribution through Optical access networks to enable sub-Metre positioning accuracy (ATOM) Innovate UK £192,867 Nov. 1, 2022 Oct. 31, 2023 Active 8 Accurate Time and radio signal distribution through Optical access networks to enable sub-Metre positioning accuracy (ATOM) Innovate UK £964,335 Nov. 1, 2022 Jan. 31, 2024 Active 9 Purchase of Six Component Wind Tunnel Balance EPSRC £1,509,988 June 30, 2018 Dec. 31, 2021 Closed 10 Purchase of Six Component Wind Tunnel Balance EPSRC £3,774,970 June 30, 2018 Dec. 31, 2021 Closed 11 Fluid-structure coupling for the stability and energy performance of a wind turbine with hyper- flexible blades, under different hydrodynamic flow reg EPSRC £0 Oct. 17, 2021 Oct. 17, 2024 Active 12 Scalable AM Rule Creation & Dissemination (SAMRCD) Innovate UK £2,833,006 Nov. 1, 2021 Oct. 31, 2023 Active 13 Scalable AM Rule Creation & Dissemination (SAMRCD) ISCF £7,082,510 Nov. 1, 2021 Jan. 31, 2024 Active 14 Deep UV high-value manufacturing laser instruments EPSRC £1,126,808 July 31, 2015 July 30, 2019 Closed 15 Multidisciplinary Underpinning Instrumentation investment EPSRC £788,000 Nov. 11, 2020 May 9, 2022 Closed 16 PIPSS Defence & Security Themed Call: Durham University/AGI Transmissometer Project STFC £322,302 Sept. 30, 2007 March 30, 2010 Closed 17 PIPSS Defence & Security Themed Call: Durham University/AGI Transmissometer Project STFC £805,755 Sept. 30, 2007 March 31, 2010 Closed 18 Beach change over individual wave cycles on sand and gravel beaches NERC £380,980 Feb. 1, 2008 Jan. 31, 2010 Closed 19 Computational Simulation Tools and Environment for Optimising the Manufacture of Ultra-precision Surfaces Innovate UK £74,338 April 30, 2017 July 30, 2018 Closed 20 Field Testing of the Durham/AGI Transmissometer STFC £91,818 Sept. 30, 2009 March 30, 2010 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »