Home Projects More like: Evaluation of a hybrid microwave process to replace malt kilning: feasibility and impacts on malt quality [Clear] # Title Funder Funding Start End Status 41 Low carbon Food Processing with Solid State Microwave Technologies BBSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 42 Feasibility experiments to quantify the compatibility of C-Capture’s solvent technology with the requirements of the glass manufacturing industry Innovate UK £119,200 Sept. 30, 2020 Dec. 31, 2020 Closed 43 Electroformed Hydrogen Containment Tank - Pilot Line Innovate UK £1,709,015 Nov. 1, 2022 Feb. 29, 2024 Active 44 Clean Low Carbon Vehicles - Combustion with Simultaneous Nitrogen and Hydrogen Enrichment EPSRC £872,520 Feb. 1, 2011 Dec. 31, 2012 Closed 45 Energy harvesting to reduce the carbon footprint of the gas distribution network Innovate UK £119,890 Sept. 30, 2020 Dec. 31, 2020 Closed 46 Energy harvesting to reduce the carbon footprint of the gas distribution network Innovate UK £299,725 Sept. 30, 2020 Dec. 31, 2020 Closed 47 Terahertz frequency devices and systems for ultrahigh capacity wireless communications EPSRC £7,097,283 Aug. 31, 2022 Aug. 30, 2027 Active 48 Experimental and theoretical modelling of hot-gas ingestion through gas-turbine rim seals EPSRC £1,065,226 Feb. 12, 2013 Aug. 9, 2016 Closed 49 Decarbonisation of oil: Microwave-catalytic production of clean hydrogen from fossil fuels EPSRC £477,178 March 31, 2020 June 29, 2022 Closed 50 Decarbonisation of oil: Microwave-catalytic production of clean hydrogen from fossil fuels EPSRC £1,192,945 March 31, 2020 June 30, 2022 Closed 51 Molecular mechanism and engineering of P450 peroxygenases for synthetic biology applications BBSRC £924,162 June 30, 2016 June 29, 2019 Closed 52 Molecular mechanism and engineering of P450 peroxygenases for synthetic biology applications BBSRC £2,310,405 June 30, 2016 June 30, 2019 Closed 53 Lowering the H2 cost in Methane Cracking Technology by use solid carbon as an Energy Storage Material EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 54 Econoblok certification Innovate UK £10,000 July 31, 2013 Jan. 31, 2014 Closed 55 ENG1281 - Development of new absorber technologies for CO2 capture and usage EPSRC £0 Sept. 30, 2019 Aug. 30, 2020 Closed 56 Engineering biobutanol production in a cellulosic clostridium using synthetic biology principles BBSRC £148,820 Sept. 30, 2009 Sept. 29, 2013 Closed 57 Engineering biobutanol production in a cellulosic clostridium using synthetic biology principles BBSRC £372,050 Sept. 30, 2009 Sept. 30, 2013 Closed 58 Uncertainty and risk in the development of additive manufacturing produced structures in the aerospace industry EPSRC £0 Sept. 24, 2017 Dec. 31, 2021 Closed 59 Uncertainty and risk in the development of additive manufacturing produced structures in the aerospace industry EPSRC, NERC £0 Sept. 30, 2017 Dec. 31, 2021 Closed 60 Developing strategies and a toolbox for metabolic engineering of thermophiles for ethanol production BBSRC £676,174 Feb. 1, 2007 May 30, 2010 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »