Home Projects More like: South West Regional Centre of Excellence for two-dimensional liquid chromatography with high resolution ion mobility mass spectrometry [Clear] # Title Funder Funding Start End Status 41 Hy-MAP; Hydrogen Mapping in Metallic Alloys Innovate UK £77,455 Jan. 1, 2022 March 31, 2022 Closed 42 Equipment to Underpin Internationally Leading Research at the University of Bristol EPSRC £2,208,000 March 31, 2015 March 30, 2016 Closed 43 Equipment to Underpin Internationally Leading Research at the University of Bristol EPSRC £5,520,000 March 31, 2015 March 31, 2016 Closed 44 Engineering sustainable routes to carbon capture and reusage: Conversion of CO2 from steelworks to coating products. EPSRC £0 Sept. 30, 2019 Dec. 30, 2023 Active 45 Engineering sustainable routes to carbon capture and reusage: Conversion of CO2 from steelworks to coating products. EPSRC £0 Sept. 30, 2019 Dec. 30, 2023 Active 46 Laser induced breakdown spectroscopy tandem with laser ablation NERC £297,678 Sept. 30, 2019 July 29, 2020 Closed 47 Ionic Liquid Irradiation EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 48 Ionic Liquid Irradiation EPSRC £0 Sept. 26, 2021 Sept. 30, 2025 Active 49 A Novel Laser Enhanced Instrument for Nuclear Waste Characterisation Innovate UK £49,456 Nov. 1, 2022 April 29, 2023 Active 50 NNUF2a: Facility for Radioactive Materials Surfaces (FaRMS) EPSRC £4,611,350 Sept. 30, 2021 March 31, 2024 Active 51 Velocity map imaging EPSRC £32,908 April 17, 2008 April 16, 2009 Closed 52 Velocity map imaging EPSRC £82,270 April 17, 2008 April 17, 2009 Closed 53 Advanced Inorganic Functional Materials: Floating Zone Crystal Growth System EPSRC £803,374 April 14, 2017 April 13, 2021 Closed 54 Optical tweezing for bio refining applications EPSRC £0 Sept. 22, 2019 March 30, 2023 Active 55 Optical tweezing for bio refining applications EPSRC £0 Sept. 30, 2019 Jan. 27, 2024 Closed 56 Bio-Acrylic Acid Production from Seaweed (BAAPS) BBSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 57 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £2,548,872 Sept. 30, 2014 Sept. 29, 2016 Closed 58 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £1,455,818 Sept. 30, 2016 June 29, 2019 Closed 59 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £6,372,180 Sept. 30, 2014 Sept. 30, 2016 Closed 60 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £3,639,545 Sept. 30, 2016 June 30, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »