# Title Funder Funding Start End Status
21 Thaleron Fast Start Innovate UK
£49,999
Nov. 1, 2022 March 30, 2023 Active
22 Serial Hybrid Kinetic Energy Storage Systems - SHyKESS EPSRC
£402,398
May 31, 2017 Aug. 30, 2019 Closed
23 Serial Hybrid Kinetic Energy Storage Systems - SHyKESS EPSRC
£1,005,995
May 31, 2017 Aug. 31, 2019 Closed
24 A Low Cost Ferrite Based Direct Drive Permanent Magnet Generator for Wind Turbines Innovate UK
£2,518,116
Aug. 31, 2017 May 30, 2019 Closed
25 A Low Cost Ferrite Based Direct Drive Permanent Magnet Generator for Wind Turbines Innovate UK
£6,295,290
Aug. 31, 2017 May 31, 2019 Closed
26 Advanced Materials for Lightweight Wind Turbine Systems - Proof of Market Innovate UK
£50,000
Feb. 1, 2012 July 30, 2012 Closed
27 Advanced Materials for Lightweight Wind Turbine Systems - Proof of Market AHRC, Innovate UK
£125,000
Feb. 1, 2012 July 31, 2012 Closed
28 The fluid dynamics of the vortex ring state. EPSRC
£0
Oct. 2, 2016 March 30, 2020 Closed
29 Evance 15kW Utra Low Noise Wind Turbine Innovate UK
£500,034
Jan. 1, 2013 May 30, 2015 Closed
30 Scale-resolving simulations of atmosphere / wind farm interactions NERC
£0
Sept. 30, 2021 March 30, 2025 Active
31 Scale-resolving simulations of atmosphere / wind farm interactions NERC
£0
Sept. 30, 2021 March 31, 2025 Active
32 IPEC Ltd - Offshore windfarm array cable and switchgear Partial Discharge (PD) monitoring Innovate UK
£200,000
Nov. 1, 2011 Oct. 31, 2012 Closed
33 IPEC Ltd - Offshore windfarm array cable and switchgear Partial Discharge (PD) monitoring Innovate UK
£500,000
Nov. 1, 2011 Oct. 31, 2012 Closed
34 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£2,953,388
Nov. 2, 2015 April 30, 2019 Closed
35 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£7,383,470
Nov. 2, 2015 May 1, 2019 Closed
36 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£2,580,280
June 30, 2021 June 29, 2026 Active
37 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£6,450,700
June 30, 2021 June 30, 2026 Active
38 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC
£2,026,678
Aug. 31, 2021 Aug. 30, 2024 Active
39 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC
£5,066,695
Aug. 31, 2021 Aug. 31, 2024 Active
40 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£202,124
May 31, 2018 June 29, 2020 Closed
Reset