Home Projects More like: System Level Design and Feasibility of the Myriad Multi-rotor Wind Turbine Concept [Clear] # Title Funder Funding Start End Status 21 Thaleron Fast Start Innovate UK £49,999 Nov. 1, 2022 March 30, 2023 Active 22 Serial Hybrid Kinetic Energy Storage Systems - SHyKESS EPSRC £402,398 May 31, 2017 Aug. 30, 2019 Closed 23 Serial Hybrid Kinetic Energy Storage Systems - SHyKESS EPSRC £1,005,995 May 31, 2017 Aug. 31, 2019 Closed 24 A Low Cost Ferrite Based Direct Drive Permanent Magnet Generator for Wind Turbines Innovate UK £2,518,116 Aug. 31, 2017 May 30, 2019 Closed 25 A Low Cost Ferrite Based Direct Drive Permanent Magnet Generator for Wind Turbines Innovate UK £6,295,290 Aug. 31, 2017 May 31, 2019 Closed 26 Advanced Materials for Lightweight Wind Turbine Systems - Proof of Market Innovate UK £50,000 Feb. 1, 2012 July 30, 2012 Closed 27 Advanced Materials for Lightweight Wind Turbine Systems - Proof of Market AHRC, Innovate UK £125,000 Feb. 1, 2012 July 31, 2012 Closed 28 The fluid dynamics of the vortex ring state. EPSRC £0 Oct. 2, 2016 March 30, 2020 Closed 29 Evance 15kW Utra Low Noise Wind Turbine Innovate UK £500,034 Jan. 1, 2013 May 30, 2015 Closed 30 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 30, 2025 Active 31 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 31, 2025 Active 32 IPEC Ltd - Offshore windfarm array cable and switchgear Partial Discharge (PD) monitoring Innovate UK £200,000 Nov. 1, 2011 Oct. 31, 2012 Closed 33 IPEC Ltd - Offshore windfarm array cable and switchgear Partial Discharge (PD) monitoring Innovate UK £500,000 Nov. 1, 2011 Oct. 31, 2012 Closed 34 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £2,953,388 Nov. 2, 2015 April 30, 2019 Closed 35 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £7,383,470 Nov. 2, 2015 May 1, 2019 Closed 36 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 37 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 38 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC £2,026,678 Aug. 31, 2021 Aug. 30, 2024 Active 39 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC £5,066,695 Aug. 31, 2021 Aug. 31, 2024 Active 40 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC £202,124 May 31, 2018 June 29, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »