# Title Funder Funding Start End Status
1 Valid8 Turbine Inspection Innovate UK
£66,016
March 1, 2020 Dec. 31, 2020 Closed
2 Multi Functional Large Diameter Drilling System Innovate UK
£460,374
March 31, 2016 March 30, 2018 Closed
3 LANDSLIDE – Next Generation Well Bore-Hole Equipment for Geothermal, Oil & Gas Industries. Innovate UK
£1,826,990
Sept. 30, 2022 March 31, 2024 Active
4 Evolution of residual stress in environmental barrier coatings for ceramic matrix composites EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
5 Evolution of residual stress in environmental barrier coatings for ceramic matrix composites EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
6 TOPOLOGY OPTIMIZATION UNDER UNCERTAINTY FOR GAS TURBINE INTERNAL FLOWS EPSRC
£0
Sept. 30, 2015 Sept. 29, 2019 Closed
7 Observational constraints on the growth of supermassive black holes STFC
£494,790
Aug. 31, 2010 Aug. 30, 2012 Closed
8 Observational constraints on the growth of supermassive black holes STFC
£492,442
Aug. 31, 2009 Aug. 30, 2010 Closed
9 Observational constraints on the growth of supermassive black holes STFC
£1,231,105
Aug. 31, 2009 Aug. 31, 2010 Closed
10 Observational constraints on the growth of supermassive black holes STFC
£811,020
Aug. 31, 2010 Aug. 31, 2012 Closed
11 An investigation into combined film and internal cooling of turbine blades EPSRC
£202,340
March 31, 2018 March 30, 2021 Closed
12 Prototype Development and Exploitation of a Microporous Metal based Cold Plate for the advanced Thermal Management of Semiconductors Devices Innovate UK
£148,186
March 1, 2012 Feb. 28, 2013 Closed
13 Versatile Fluid Measurement System for Aerospace Research EPSRC
£9,834
March 31, 2015 Sept. 30, 2020 Closed
14 Application of Additive Manufacture to Highly Efficiency Industrial Gas Turbines and Advanced Gas Turbine Component Design EPSRC
£0
Sept. 24, 2017 Dec. 30, 2018 Closed
15 Application of Additive Manufacture to Highly Efficiency Industrial Gas Turbines and Advanced Gas Turbine Component Design EPSRC
£0
Dec. 1, 2018 Nov. 30, 2022 Active
16 Supermassive Black Holes and Galaxy Evolution STFC
£0
Sept. 30, 2019 May 25, 2023 Active
17 Supermassive Black Holes and Galaxy Evolution NERC, STFC
£0
Sept. 30, 2019 May 26, 2023 Closed
18 FastEDR - Fastener Electro-Discharge Removal for high-value engineering systems Innovate UK
£866,736
July 31, 2021 July 30, 2022 Closed
19 Environmentally induced damage propagation with localised stresses in CMCs EPSRC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
20 Experimental Investigation of Gas Turbine Aerodynamics using Planar Laser-Induced Fluorescence (PLIF). EPSRC
£0
Sept. 30, 2016 March 30, 2020 Closed
Reset