# Title Funder Funding Start End Status
41 Evolution of residual stress in environmental barrier coatings for ceramic matrix composites EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
42 A Nuclear Decommissioning Manipulator with Novel Variable Impedance Actuator EPSRC
£1,987,545
Nov. 1, 2021 Sept. 30, 2024 Active
43 Active control of fluid flows in gas turbines EPSRC
£1,570,348
March 30, 2014 Sept. 28, 2017 Closed
44 Modelling environmentally assisted cracking in Ni-based superalloys EPSRC
£0
Sept. 30, 2019 March 31, 2024 Active
45 Smart Energy Research Lab EPSRC
£11,877,706
Aug. 27, 2017 Aug. 26, 2023 Active
46 Smart Energy Research Lab EPSRC
£29,694,265
Aug. 27, 2017 Aug. 28, 2023 Closed
47 A Micro-Mechanistic Study of Oxygen-Diffusion-Assisted Crack Growth in a Polycrystalline Nickel-Based Superalloy EPSRC
£393,718
Nov. 12, 2007 Nov. 11, 2010 Closed
48 Gas Flow/Market Analysis Innovate UK
£135,612
Aug. 31, 2018 Sept. 29, 2019 Closed
49 Gas Flow/Market Analysis Innovate UK
£339,030
Aug. 31, 2018 Sept. 30, 2019 Closed
50 Super-resolution 3D ultrasound tomography for material microstructure characterisation EPSRC
£0
Jan. 1, 2023 Dec. 31, 2026 Active
51 Clean water via Membrane Capacitive Deionisation EPSRC
£0
Aug. 31, 2018 June 29, 2022 Active
52 Commercialisation of CHOTs EPSRC
£302,576
June 30, 2012 Nov. 30, 2013 Closed
53 A new design concept for a 25kW micro gas turbine for a hybrid car Innovate UK
£10,000
Nov. 1, 2014 April 29, 2015 Closed
54 ACE Diesel Innovate UK
£49,740
Sept. 30, 2012 June 29, 2013 Closed
55 Predictive Modelling of the Fundamentals of Failure in Metals EPSRC
£302,187
July 31, 2016 July 30, 2018 Closed
56 Next-generation materials for turbine engines: Environmental and mechanical performance of a metallic ultra-high temperature materials system EPSRC
£0
Sept. 25, 2022 March 30, 2026 Active
57 Multi-Platform Inspection Maintenance & Repair In Extreme Environment (MIMRee) Innovate UK
£5,975,106
March 1, 2019 May 30, 2021 Closed
58 Multi-Platform Inspection Maintenance & Repair In Extreme Environment (MIMRee) ISCF
£14,937,765
March 1, 2019 May 31, 2021 Closed
59 Transforming heat-recovery system performance by exploiting multi component turbine flows EPSRC
£1,597,430
Dec. 1, 2014 Nov. 30, 2019 Closed
60 Transforming heat-recovery system performance by exploiting multi component turbine flows EPSRC
£3,993,575
Dec. 1, 2014 Nov. 30, 2019 Closed
Reset