Home Projects More like: To develop a non-equilibrium wet steam throughflow calculation method, including modelling of all the loss-generating two-phase phenomena [Clear] # Title Funder Funding Start End Status 81 BRIC DOCTORATE PROGRAMME - Understanding on-column protein aggregation and its impact on bioprocessing BBSRC £311,796 Sept. 30, 2011 Sept. 29, 2015 Closed 82 BRIC DOCTORATE PROGRAMME - Understanding on-column protein aggregation and its impact on bioprocessing BBSRC £519,660 Sept. 30, 2011 Sept. 30, 2015 Closed 83 Stress jump boundary condition capturing for the lattice Boltzmann simulation methods EPSRC £164,138 Nov. 3, 2014 May 1, 2017 Closed 84 Monitoring airborne transmission inside buildings using MF-BM Innovate UK £183,266 Nov. 1, 2020 April 29, 2021 Closed 85 Monitoring airborne transmission inside buildings using MF-BM Innovate UK £458,165 Nov. 1, 2020 April 30, 2021 Closed 86 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £2,066,770 March 31, 2015 Nov. 30, 2018 Closed 87 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £5,166,925 March 31, 2015 Nov. 30, 2018 Closed 88 Performance Optimization of IT-SOFCs by Inkjet Printing on Porous Metal Substrates (JETCELL) EPSRC £773,276 Nov. 1, 2011 March 30, 2015 Closed 89 Performance Optimization of IT-SOFCs by Inkjet Printing on Porous Metal Substrates (JETCELL) EPSRC £1,933,190 Nov. 1, 2011 March 31, 2015 Closed 90 (SuperCO2) Phase transition of supercritical carbon dioxide (CO2) in transonic flows for shaping next-generation turbines UKRI £204,031 Dec. 1, 2022 Nov. 30, 2024 Active 91 Innovative Forging and Fabrication Solutions for the Energy Sector EPSRC £599,510 June 30, 2015 June 30, 2018 Closed 92 In-situ studies of strain accommodation in MAX phase materials for advanced nuclear energy EPSRC, NERC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 93 A numerical study on aerofoil trailing edge noise and its reduction methods for the next-generation wind turbines EPSRC £0 April 29, 2018 April 29, 2021 Closed 94 Predictive Multiscale Modelling Protocol of Adiabatic Shear Band Initiation in Manufacturing and Aerospace Materials EPSRC £556,764 Jan. 1, 2022 June 28, 2024 Active 95 Pore scale release and transport of oil by low salinity water EPSRC £0 Sept. 30, 2018 Dec. 31, 2022 Closed 96 Prevention and mitigation of accidents with hydrogen-powered vehicles in tunnels EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 97 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant EPSRC £342,860 Feb. 1, 2016 Dec. 31, 2019 Closed 98 FLOW OF GAS-LIQUID FOAMS IN NARROW COMPLEX GEOMETRIES EPSRC £2,099,935 Feb. 1, 2016 Oct. 31, 2019 Closed 99 CFD investigations of turbine rim seal physics EPSRC £0 March 31, 2017 June 29, 2020 Closed 100 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £3,627,210 Dec. 1, 2009 Jan. 10, 2011 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »