Home Projects More like: Development and application of lattice Boltzmann models for predictive large eddy simulation of turbomachinery aerodynamics [Clear] # Title Funder Funding Start End Status 81 Modelling and Control of Flexible Structures Interacting with Fluids (ModConFlex) Horizon Europe Guarantee £2,652,510 April 30, 2023 April 30, 2027 Active 82 Modelling and Control of Flexible Structures Interacting with Fluids (ModConFlex) Horizon Europe Guarantee £663,125 Feb. 1, 2023 Jan. 31, 2027 Active 83 Modelling and Control of Flexible Structures Interacting with Fluids (ModConFlex) UKRI £1,061,004 Feb. 1, 2023 Jan. 31, 2027 Active 84 Modelling and Control of Flexible Structures Interacting with Fluids (ModConFlex) UKRI £530,502 Feb. 1, 2023 Jan. 31, 2027 Active 85 Modelling and Control of Flexible Structures Interacting with Fluids (ModConFlex) UKRI £132,625 Feb. 1, 2023 Jan. 31, 2027 Active 86 Real-Time Distributed Optimisation of Dualed Transport & Electrical Networks Innovate UK £421,650 Sept. 30, 2020 March 30, 2021 Closed 87 Real-Time Distributed Optimisation of Dualed Transport & Electrical Networks Innovate UK £1,054,125 Sept. 30, 2020 March 31, 2021 Closed 88 PELAgIO: Physics-to-Ecosystem Level Assessment of Impacts of Offshore Windfarms NERC £3,169,335 Aug. 7, 2022 Aug. 7, 2025 Active 89 PELAgIO: Physics-to-Ecosystem Level Assessment of Impacts of Offshore Windfarms NERC £633,867 Aug. 7, 2022 Aug. 6, 2025 Active 90 PELAgIO: Physics-to-Ecosystem Level Assessment of Impacts of Offshore Windfarms NERC £2,735,940 Aug. 8, 2022 Aug. 8, 2025 Active 91 PELAgIO: Physics-to-Ecosystem Level Assessment of Impacts of Offshore Windfarms NERC £532,188 Aug. 8, 2022 Aug. 7, 2025 Active 92 Physics-to-Ecosystem Level Assessment of Impacts of Offshore Wind Farms (PELAgIO) NERC £1,101,180 July 31, 2022 July 31, 2025 Active 93 Physics-to-Ecosystem Level Assessment of Impacts of Offshore Wind Farms (PELAgIO) NERC £220,236 July 31, 2022 July 30, 2025 Active 94 PELAgIO: Physics to Ecosystem Level Assessment of Impacts of Offshore Wind Farms NERC £2,245,350 Aug. 8, 2022 Aug. 8, 2025 Active 95 PELAgIO: Physics-to-Ecosystem Level Assessment of Impacts of Offshore Wind Farms NERC £229,585 July 31, 2022 July 31, 2025 Active 96 PELAgIO: Physics-to-Ecosystem Level Assessment of Impacts of Offshore Wind Farms NERC £45,917 July 31, 2022 July 30, 2025 Active 97 PELAgIO: Physics to Ecosystem Level Assessment of Impacts of Offshore Wind Farms NERC £449,070 Aug. 8, 2022 Aug. 7, 2025 Active 98 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 99 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 100 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »