# Title Funder Funding Start End Status
1 A new environmentally friendly process for concrete block production Innovate UK
£10,000
July 31, 2013 Jan. 31, 2014 Closed
2 Briquetting of recycled glass fines for energy and CO2 reduction in the glass industry Innovate UK
£119,244
Sept. 30, 2016 Sept. 29, 2017 Closed
3 Increasing the early age strength of High Volume Fly Ash (HVFA) concrete EPSRC
£195,514
Sept. 9, 2012 March 9, 2015 Closed
4 Briquetting of recycled glass fines for energy and CO2 reduction in the glass industry EPSRC
£192,906
Sept. 30, 2016 Sept. 29, 2017 Closed
5 Briquetting of recycled glass fines for energy and CO2 reduction in the glass industry EPSRC
£482,265
Sept. 30, 2016 Sept. 30, 2017 Closed
6 Closing the loop on zinc oxide - transforming foundation industry waste to value Innovate UK
£15,000
Feb. 1, 2022 March 30, 2022 Closed
7 Closing the loop on zinc oxide - transforming foundation industry waste to value ISCF
£75,000
Feb. 1, 2022 March 31, 2022 Closed
8 ULECES: Ultra low energy cement synthesis: A radical process change to achieve green and sustainable technologies EPSRC
£1,240,862
Jan. 7, 2008 July 5, 2011 Closed
9 ULECES: Ultra low energy cement synthesis: A radical process change to achieve green and sustainable technologies EPSRC
£3,102,155
Jan. 7, 2008 July 6, 2011 Closed
10 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC
£249,904
Nov. 1, 2010 Feb. 21, 2014 Closed
11 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC
£276,912
Oct. 14, 2010 Jan. 31, 2014 Closed
12 Microwave assisted pretreatment of lignocellulosic residues for better performance as solid fuels in fluidzsed bed (FB) energy production technologies EPSRC
£199,556
Jan. 1, 2018 March 30, 2021 Closed
13 Microwave assisted pretreatment of lignocellulosic residues for better performance as solid fuels in fluidzsed bed (FB) energy production technologies EPSRC
£498,890
Jan. 1, 2018 March 31, 2021 Closed
14 Caesium Mobility and Phase Separation Processes in Borosilicate Glasses EPSRC
£177,145
Dec. 1, 2007 Nov. 30, 2008 Closed
15 SCOTWOHR - INDUSTRIAL WASTE HEAT RECOVERY USING SUPERCRITICAL CARBON DIOXIDE CYCLES EPSRC
£1,415,850
Jan. 1, 2021 Dec. 31, 2023 Active
16 Industrial waste heat recovery using supercritical carbon dioxide cycles (SCOTWOHR) EPSRC
£1,535,718
Jan. 1, 2021 Dec. 31, 2023 Active
17 Industrial waste heat recovery using supercritical carbon dioxide cycles (SCOTWOHR) EPSRC
£3,839,295
Jan. 1, 2021 Dec. 31, 2024 Active
18 Breakthrough High Temperature Heat Pump Technology for Foundation Industry Decarbonisation Innovate UK
£1,042,078
March 31, 2021 March 30, 2022 Closed
19 The valorization of contaminated waste glass to produce locally sourced, low-carbon cement at the Cemex Rugby cement plant Innovate UK
£2,572,820
Sept. 30, 2022 Sept. 29, 2024 Active
20 Continuous Solid-state Smart Microwave-based System for Manufacturing Low-carbon Concretes Innovate UK
£1,198,262
March 31, 2013 Sept. 29, 2016 Closed