# Title Funder Funding Start End Status
41 BioElectrochemical LIthium rEcoVEry (BELIEVE) BBSRC
£1,493,960
Feb. 2, 2023 Feb. 1, 2025 Active
42 Advanced Diagnoses of Fuel cell modules and optimisation of lamination conditions for Bramble Energy EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
43 Low-cost, high-performance catalyst for high temperature polymer electrolyte fuel cells Innovate UK
£180,636
July 31, 2013 July 30, 2014 Closed
44 Advanced Design + Optimisation (ADOPT) Innovate UK
£338,644
March 31, 2010 March 31, 2013 Closed
45 Impact of Algal Harvesting Technology on Ecosystem Function NERC
£891,845
Aug. 15, 2012 Sept. 15, 2014 Closed
46 Impact of Algal Harvesting Technology on Ecosystem Function NERC
£356,738
Aug. 15, 2012 Sept. 14, 2014 Closed
47 Research, build and test the world's first 1kW environmental monitoring system powered by platinum free cathode technology Innovate UK
£1,948,622
Dec. 1, 2009 Nov. 30, 2012 Closed
48 Deposition and characterisation of high corrosion resistance and high electrical insolating thin film coatings EPSRC
£0
Nov. 1, 2021 April 29, 2025 Active
49 Ultra Thin Advanced Aerospace Alloy Joining Using Automated Constricted Gas Tungsten Arc STFC
£652,846
Oct. 23, 2011 Oct. 22, 2014 Closed
50 EPSRC Centre for Doctoral Training in Fuel Cells and their Fuels - Clean Power for the 21st Century EPSRC
£8,939,326
March 31, 2014 Feb. 28, 2023 Active
51 EPSRC Centre for Doctoral Training in Fuel Cells and their Fuels - Clean Power for the 21st Century EPSRC
£22,432,410
March 31, 2014 Feb. 28, 2023 Closed
52 Lithium Innovations for Future Electric vehicles (LIFE) ISCF
£2,492,935
March 31, 2018 June 30, 2019 Closed
53 Prototype Development and Exploitation of a Microporous Metal based Cold Plate for the advanced Thermal Management of Semiconductors Devices Innovate UK
£148,186
March 1, 2012 Feb. 28, 2013 Closed
54 AGR Technologies for Enabling Molten Salt-cooled Reactor Designs EPSRC
£1,640,640
Aug. 31, 2018 Nov. 30, 2021 Closed
55 Redox Flow Battery Materials for Energy Storage EPSRC
£0
Sept. 30, 2019 March 30, 2023 Active
56 Redox Flow Battery Materials for Energy Storage EPSRC
£0
Sept. 30, 2019 March 31, 2023 Closed
57 AR-Mini: AI-powered renewable mini-grids for rural regions in Sri Lanka Innovate UK
£787,755
March 31, 2023 March 31, 2024 Active
58 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£733,012
Sept. 30, 2018 Dec. 31, 2021 Closed
59 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£2,442,164
Sept. 30, 2015 Sept. 29, 2018 Closed
60 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£1,832,530
Sept. 30, 2018 Dec. 31, 2021 Closed
Reset