Home Projects More like: Engineered UK clays for production of low-carbon cements [Clear] # Title Funder Funding Start End Status 81 Harris brick safety system Innovate UK £46,578 Nov. 1, 2022 April 29, 2023 Active 82 UK-India Foundation Industries Sustainable Thermal Energy Management Collaboration (UK-India FI-SusTEM Collaboration) Innovate UK £159,846 Nov. 1, 2021 March 30, 2022 Closed 83 UK-India Foundation Industries Sustainable Thermal Energy Management Collaboration (UK-India FI-SusTEM Collaboration) Innovate UK £399,615 Nov. 1, 2021 March 31, 2022 Closed 84 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC £249,904 Nov. 1, 2010 Feb. 21, 2014 Closed 85 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC £276,912 Oct. 14, 2010 Jan. 31, 2014 Closed 86 An alternative route to green hydrogen and battery grade materials Innovate UK £159,690 Nov. 1, 2020 May 30, 2021 Closed 87 Recycling of FRP wind blade waste material in concrete EPSRC £0 Sept. 27, 2020 Jan. 31, 2025 Active 88 Recycling of FRP wind blade waste material in concrete EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 89 Design & production optimisation of a novel low embodied carbon concrete structural beam solution Innovate UK £49,200 Nov. 1, 2022 April 29, 2023 Active 90 Application of the Renormalisation Group to concrete ageing EPSRC £0 Sept. 30, 2018 May 27, 2022 Active 91 NanoTool - Nano-enhanced lightweight composite tooling Innovate UK £1,438,715 July 31, 2018 July 31, 2019 Closed 92 Paper, Ash and Resin: Valorisation of Foundation Industry Waste Streams Innovate UK £387,934 July 31, 2020 Oct. 30, 2021 Closed 93 Electrokinetic Separation for Enhanced Decontamination of Soils and Groundwater Systems EPSRC £1,891,430 July 31, 2019 May 23, 2023 Closed 94 hot Gas Raman Identification and measurement For Foundation INdustries (GRIFFIN) Innovate UK £1,114,624 March 31, 2021 June 29, 2022 Active 95 Microtunnelling: Optimising Low-Emission Construction of Buried Utility Infrastructure (MOLE) EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 96 Unlocking the potential of biopolymer soil stabilisation EPSRC £201,196 Sept. 30, 2022 March 31, 2024 Active 97 Foamed glass recyclate Innovate UK £25,000 July 31, 2013 Jan. 31, 2014 Closed 98 Industrial Research of Modular Energy Conversion System as a Steam Let-down Expander Innovate UK £457,590 Nov. 1, 2021 Nov. 30, 2022 Active 99 Industrial Research of Modular Energy Conversion System as a Steam Let-down Expander Innovate UK £1,143,975 Nov. 1, 2021 Nov. 30, 2022 Closed 100 Climate-change effects on the performance of bioengineered clay fill embankments EPSRC £199,284 Nov. 7, 2016 May 5, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »