Home Projects More like: CARBONSEQ: Low-carbon, High-performance Concrete Using a Novel Method of CO2 Sequestration [Clear] # Title Funder Funding Start End Status 61 Microbial carbon cycling under geological CO2 storage conditions: understanding the rules of life in the engineered subsurface BBSRC £1,934,810 Jan. 1, 2022 Dec. 31, 2026 Active 62 Using novel biotechnology process to scale zero-carbon concrete and create a BioConcrete block product Innovate UK £49,991 Nov. 1, 2022 April 29, 2023 Active 63 Low-carbon, bio-based alternatives to decorative ceramic tiles Innovate UK £49,768 Nov. 1, 2022 April 29, 2023 Active 64 Mimicrete – Advancing Self-Healing Concrete Using Vascular Networks. Innovate UK £315,250 June 30, 2022 Dec. 31, 2023 Active 65 Humber Industrial Decarbonisation Roadmap Innovate UK £189,600 March 31, 2020 July 30, 2020 Closed 66 Humber Industrial Decarbonisation Roadmap ISCF £474,000 March 31, 2020 July 31, 2020 Closed 67 Low carbon damage resistance concrete for roads EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 68 Low Carbon Cement Replacement For Pre Cast Concrete Products Innovate UK £104,600 Feb. 1, 2022 July 30, 2022 Closed 69 Sustainable Design of Basalt Fibre Reinforced Polymer Reinforced Concrete Structures Innovate UK £249,400 May 31, 2023 Dec. 31, 2023 Active 70 Microtunnelling: Optimising Low-Emission Construction of Buried Utility Infrastructure (MOLE) EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 71 Design of Resilient Concrete Infrastructure for Corrosive Biogenic Environments EPSRC £0 Sept. 21, 2017 March 30, 2021 Closed 72 Design of Resilient Concrete Infrastructure for Corrosive Biogenic Environments EPSRC £0 Sept. 30, 2017 March 31, 2021 Closed 73 BIM BAMBOO EPSRC £492,144 March 2, 2015 Sept. 28, 2017 Closed 74 Application of the Renormalisation Group to concrete ageing EPSRC £0 Sept. 30, 2018 May 27, 2022 Active 75 Non Steady Analytical Models for Energy Pile Testing and Design EPSRC £199,538 Dec. 1, 2016 Sept. 13, 2019 Closed 76 Non Steady Analytical Models for Energy Pile Testing and Design EPSRC £498,845 Dec. 1, 2016 Sept. 14, 2019 Closed 77 REcovey and use of Cement kIlN Dust as the alkali activator for geopolymeric (cementless) concrete building blocks (RESCIND) Innovate UK £499,128 Nov. 1, 2015 April 29, 2018 Closed 78 A new environmentally friendly process for concrete block production Innovate UK £10,000 July 31, 2013 Jan. 31, 2014 Closed 79 Direct Carbon Fuel Cell System Development Study EPSRC £284,946 March 31, 2008 Sept. 29, 2009 Closed 80 Direct Carbon Fuel Cell System Development Study EPSRC £712,365 March 31, 2008 Sept. 30, 2009 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »