Home Projects More like: MykoSIP: An innovative, low carbon, structurally insulated, composite building panel designed to be easily disassembled while following circularity principles. [Clear] # Title Funder Funding Start End Status 41 Digital design of building structures for optimised cost and carbon performance Innovate UK £417,866 Sept. 30, 2018 Feb. 28, 2021 Closed 42 Increasing the early age strength of High Volume Fly Ash (HVFA) concrete EPSRC £195,514 Sept. 9, 2012 March 9, 2015 Closed 43 AI-enabled Decarbonisation Assessment Score and Analytics for Net-Zero Construction Operations (AI-DASA) Innovate UK £198,800 Nov. 1, 2020 Jan. 31, 2021 Closed 44 Fire Resistant Rainscreen Cladding Innovate UK £129,868 Nov. 1, 2020 April 29, 2021 Closed 45 Fire Resistant Rainscreen Cladding Innovate UK £324,670 Nov. 1, 2020 April 30, 2021 Closed 46 AI System for Predicting Embodied Carbon (ASPEC) in Infrastructure Projects Innovate UK £1,122,992 Nov. 1, 2020 Oct. 31, 2022 Active 47 Microtunnelling: Optimising Low-Emission Construction of Buried Utility Infrastructure (MOLE) EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 48 Aligning technology, politics and economics to achieve allocative resource efficiency in the UK EPSRC £0 Sept. 30, 2018 Sept. 30, 2021 Closed 49 Aligning technology, politics and economics to achieve allocative resource efficiency in the UK EPSRC £0 Sept. 30, 2018 Sept. 30, 2021 Closed 50 G8-2012 Structural Bamboo Products EPSRC £845,504 Feb. 1, 2013 Jan. 31, 2016 Closed 51 Bio-fabrication of sustainable functional bacterial cellulose aerogel for building insulation EPSRC £1,249,070 June 11, 2023 June 11, 2025 Active 52 Digital twinning of an innovative low head, low cost hydro mini grid generator Innovate UK £49,982 Nov. 1, 2022 March 30, 2023 Active 53 Biomanufacturing with carbon capture and utilisation: A Zero Carbon Loss System EPSRC £2,770,214 March 1, 2022 Feb. 28, 2025 Active 54 Better Greener Faster Facades Innovate UK £602,118 Sept. 30, 2020 Nov. 30, 2021 Closed 55 Better Greener Faster Facades Innovate UK £1,505,295 Sept. 30, 2020 Nov. 30, 2021 Closed 56 Intelligent Additive Construction using Geomaterials EPSRC £0 Sept. 23, 2018 Jan. 24, 2023 Active 57 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses Innovate UK £1,433,670 March 1, 2019 Feb. 28, 2021 Closed 58 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses ISCF £3,584,175 March 1, 2019 Feb. 28, 2021 Closed 59 Policy and practice: understanding the built environment's transition to a circular economy in the UK and Canada NERC £11,289 Aug. 31, 2022 Aug. 30, 2023 Active 60 Analytics tool to support the UK construction sector to measure and reduce scope 3 emissions in their supply chain Innovate UK £49,186 Nov. 1, 2022 March 30, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »