Home Projects More like: Three-dimensional laccase electrodes for miniaturised fuel cell power sources [Clear] # Title Funder Funding Start End Status 21 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £355,165 July 31, 2011 June 30, 2012 Closed 22 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £652,725 May 6, 2010 Oct. 1, 2010 Closed 23 Inkjet printing enzymes for biosensor and biotechnology applications BBSRC £150,562 Sept. 30, 2010 Sept. 29, 2014 Closed 24 Inkjet printing enzymes for biosensor and biotechnology applications BBSRC £376,405 Sept. 30, 2010 Sept. 30, 2014 Closed 25 Metal-hydrido intermediates in enzymes: atomic level mechanistic insight and technological applications of hydrogenases BBSRC £799,806 March 1, 2014 Dec. 31, 2017 Closed 26 Metal-hydrido intermediates in enzymes: atomic level mechanistic insight and technological applications of hydrogenases BBSRC £853,824 Jan. 14, 2014 Jan. 13, 2017 Closed 27 Function and regulation of mitochondrial cytochrome c oxidase using mutant forms of the yeast enzyme BBSRC £873,406 Sept. 30, 2012 March 25, 2016 Closed 28 Function and regulation of mitochondrial cytochrome c oxidase using mutant forms of the yeast enzyme BBSRC £2,183,515 Sept. 30, 2012 March 25, 2016 Closed 29 Substituent and anchor group effects in bonding to TiO2 Single Crystal Surfaces: Enhancing Solar Conversion Efficiency and Corrosion Inhibition. EPSRC £9,914 June 30, 2015 Sept. 29, 2015 Closed 30 Development of carboxyl methyltransferases for sustainable synthesis BBSRC £398,037 Aug. 31, 2022 Aug. 30, 2025 Active 31 Development of carboxyl methyltransferases for sustainable synthesis BBSRC £1,990,185 March 2, 2023 March 1, 2026 Active 32 In-situ studies of electrocatalysts using Near-Ambient Pressure EPSRC £0 Sept. 17, 2017 Jan. 10, 2022 Closed 33 Ultra-low loading Pt electrocatalysts based on carbon support alloys for oxygen reduction in hydrogen fuel cells and their lifetime prediction EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 34 Minerals for Sustainable COst and energy efficient chemical looping combUstion Technology EPSRC £842,530 Jan. 1, 2014 May 31, 2016 Closed 35 NextGen Structural Biology under Electrochemical Control: Filling in Missing Intermediates in Metalloenzyme Catalytic Cycles BBSRC £577,544 Jan. 1, 2023 Dec. 31, 2025 Active 36 NextGen Structural Biology under Electrochemical Control: Filling in Missing Intermediates in Metalloenzyme Catalytic Cycles BBSRC £418,416 Jan. 1, 2023 Dec. 31, 2025 Active 37 NextGen Structural Biology under Electrochemical Control: Filling in Missing Intermediates in Metalloenzyme Catalytic Cycles BBSRC £2,887,720 Feb. 1, 2023 Jan. 31, 2026 Active 38 How E. coli produces hydrogen BBSRC £634,088 Jan. 16, 2012 Sept. 14, 2015 Closed 39 How E. coli produces hydrogen BBSRC £708,816 Jan. 9, 2012 Jan. 8, 2015 Closed 40 Bio-inspired Solar Light Driven Hydrogen Production EPSRC £1,494,220 Sept. 30, 2010 Feb. 28, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »