# Title Funder Funding Start End Status
41 Improving photocatalytic splitting of water using biomimetic quantum dot assemblies EPSRC
£0
Sept. 30, 2018 March 30, 2023 Active
42 Improving photocatalytic splitting of water using biomimetic quantum dot assemblies EPSRC
£0
Sept. 30, 2018 March 31, 2023 Closed
43 Main Group Element Based Catalysis for Photolytic HX-Splitting EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
44 Main Group Element Based Catalysis for Photolytic HX-Splitting EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
45 Electrochemical conversion of nitrogen to ammonia-experimental and theoretical studies EPSRC
£118,950
Feb. 1, 2016 Jan. 31, 2017 Closed
46 Green and sustainable energy storage. EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
47 Materials chemistry and electrochemistry of the lithium-air battery EPSRC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
48 Nanocrystalline Photodiodes: Novel Devices for Water Splitting EPSRC
£943,942
April 30, 2008 April 29, 2011 Closed
49 Nanocrystalline Photodiodes: Novel Devices for Water Splitting EPSRC
£1,037,316
April 30, 2008 April 29, 2011 Closed
50 Nanocrystalline Photodiodes: Novel Devices for Water Splitting EPSRC
£2,593,290
April 30, 2008 April 30, 2011 Closed
51 Practical Lithium Air Batteries EPSRC
£190,172
Nov. 1, 2013 Oct. 31, 2016 Closed
52 Practical Lithium Air Batteries EPSRC
£747,660
Nov. 1, 2013 Oct. 31, 2016 Closed
53 Practical Lithium Air Batteries EPSRC
£475,430
Nov. 1, 2013 Oct. 31, 2016 Closed
54 High Throughput Cycling Coupled XPS of Hydrogen Storage Materials EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
55 Investigation of Water Oxidizing Catalysis for Renewable Energy BBSRC
£981,366
Oct. 12, 2008 Oct. 11, 2013 Closed
56 Investigation of Water Oxidizing Catalysis for Renewable Energy BBSRC
£2,453,415
Oct. 12, 2008 Oct. 12, 2013 Closed
57 Catalyst development for low-cost large-scale sustainable hydrogen production from seawater and renewable energy EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
58 Microwave processing for fast, green preparation of insertion electrodes EPSRC
£196,582
July 10, 2013 Sept. 29, 2015 Closed
59 Quality control for high volume manufacture of fuel cells and electrolysers EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
60 A Closer Look at Direct Solar Water Splitting EPSRC, NERC
£0
Sept. 30, 2018 Oct. 28, 2022 Closed
Reset