# Title Funder Funding Start End Status
41 Design, fabrication and testing of porous material-metal hydride composites for hydrogen storage EPSRC
£0
Sept. 30, 2019 March 31, 2024 Active
42 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC
£2,096,160
Sept. 29, 2014 March 28, 2018 Closed
43 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC
£5,240,400
Sept. 29, 2014 March 29, 2018 Closed
44 Thermoelectrics Network -TEMPEST (ThermoElectric Materials, Physics, Electronics & SysTems) EPSRC
£232,572
Feb. 26, 2014 Feb. 25, 2017 Closed
45 Thermoelectrics Network -TEMPEST (ThermoElectric Materials, Physics, Electronics & SysTems) EPSRC
£581,430
Feb. 26, 2014 Feb. 25, 2017 Closed
46 Lakes and the Arctic Carbon Cycle NERC
£630,548
July 31, 2012 Jan. 31, 2016 Closed
47 Lakes and the arctic carbon cycle NERC
£419,414
July 31, 2012 Jan. 31, 2016 Closed
48 Lakes and the Arctic Carbon Cycle NERC
£102,160
Jan. 31, 2013 Jan. 30, 2016 Closed
49 Lakes and the Arctic Carbon Cycle NERC
£538,340
July 31, 2012 Jan. 31, 2016 Closed
50 HIGH END COMPUTING MATERIALS CHEMISTRY CONSORTIUM EPSRC
£978,630
Nov. 1, 2018 Dec. 31, 2022 Active
51 AIM (Advanced Instability Methods) for industry EPSRC
£675,904
Jan. 1, 2011 June 29, 2014 Closed
52 Solar Fuels EPSRC
£505,942
July 31, 2013 April 29, 2017 Closed
53 Solar Fuels EPSRC
£1,264,855
July 31, 2013 April 30, 2017 Closed
54 Next Generation Grid Scale Thermal Energy Storage Technologies (NexGen-TEST) EPSRC
£1,969,690
April 29, 2014 Oct. 28, 2017 Closed
55 Next Generation Grid Scale Thermal Energy Storage Technologies (NexGen-TEST) EPSRC
£4,924,225
April 29, 2014 Oct. 29, 2017 Closed
56 Geology to Metallurgy of Critical Rare Earths: sustainable development of Nd and HREE deposits NERC
£193,270
Aug. 31, 2013 July 9, 2014 Closed
57 Micro-scale energy storage for super-efficient wet appliances EPSRC
£201,138
March 31, 2017 Oct. 30, 2018 Closed
58 Micro-scale energy storage for super-efficient wet appliances EPSRC
£502,845
March 31, 2017 Oct. 30, 2018 Closed
Reset